Converted · interior conversion · Western Addition

1086 Fulton St

Completed Jul 2023+2 units on this lot · now 812 permits

Convert existing attic space into (2) new accessory dwelling units per ordinance 162-17. Full building sprinklers under separate permit. Upgrade attic to v-a construction.

filed Sep 2019issued Sep 2021 · permit wait 2 yearscompleted Jul 2023 · built in 1 year 10 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$314,952 for 2 ADUs
one permit, 2 units; not a per-unit price
Permit wait
2 years
filed → issued
Build time
1 year 10 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitConvert existing attic space into (2) new accessory dwelling units per ordinance 162-17. Full building sprinklers under separate permit. Upgrade attic to v-a construction.
201909182017 · Aligned Developers
filed Sep 2019 · issued Sep 2021 · done Jul 2023$175kcity record
SprinklersInsall new fire sprinkler system throughout building per nfpa 13 including 2" dedicated underground fire service per nfpa 24 and standpipe per nfpa 14. Total sprinklers 143. Ref pa# 202112073893 & 201909182017.
202203230623 · cites 201909182017 · J C P Fire Protection INC
filed Mar 2022 · issued Mar 2022$125kcity record
Related permitReplace existing fire alarm control unit witn new ifp75 control unit. Install new remote power supply, install new telguard radio communicator replace idp pull stations, replace idp smoke detectors, install new low frequency sounders in sleeping areas of every unit. Replace horn/strobes, install new.
202212138206 · C & E Electric & Fire Alarm Services
filed Dec 2022 · issued Dec 2022 · done Dec 2022$15kcity record
ElectricalNew ADU # 7: install kitchen and 2 baths. Rewire apt. New subpanel, plugs, lights, switches.
E202204139590
Apr 13, 2022 → Jul 17, 2023—
ElectricalUnit #1 - remodel kitchen & bath, upgrade unit electrical, 80 amp sub panel.
E202204139582
Apr 13, 2022 → Dec 5, 2022—
ElectricalUnit #2 - remodel kitchen & bath, upgrade unit electrical, 80 amp sub panel.
E202204139583
Apr 13, 2022 → Dec 5, 2022—
ElectricalNew ADU # 8: install kitchen and 2 baths. Rewire apt. New subpanel, plugs, lights, switches.
E202204139591
Apr 13, 2022 → Jul 19, 2023—
ElectricalReplacement of fire panel; 3 pull stations 1 smoke and sounders thru out. New wireless communicator connection to water flow and tamper.
EW202206023873
Jun 2, 2022—
PlumbingWork category: 4pb; install new fire sprinkler system throughout the building per nfpa13 including 2" dedicate underground fire service per nfpa 24 and standpipe per nfpa14.
PW20220325057
Mar 25, 2022 → Oct 18, 2022—
PlumbingInstall 2 furnances & ducting for new ADU 7 & 8.
PM20220413285
Apr 13, 2022 → Dec 16, 2022—
PlumbingRemodel 2 kitchens & 3 baths, 1 shower pan, no underground work.
PP20220413277
Apr 13, 2022 → Nov 18, 2022—
PlumbingNew ADU units 7 & 8: install 2 kitchens and 2 bathrooms.
PP20220413284
Apr 13, 2022 → Dec 16, 2022—
2 other permits on this lot during the project, not counted
OtherRenovate unit 1 + 2. Reconfigure unit 1 from studio to 1 bedroom. Reconfigure unit 2 from 2 bedroom/1 bath to 1 bed/2 office/2 bath layout. No changes to exterior + 2 office.
202112073893 · Aligned Developers
filed Dec 2021 · issued Mar 2022 · done Jan 2023$30kcity record
OtherUnit 2: revision to approved permit 202112073893 for unit 2 only. Replacement of (4) windows, installation of (1) door, installation of (1) window in place of an existing door.
202210053771 · Aligned Developers
filed Oct 2022 · issued Nov 2022 · done Jan 2023—city record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 0778, lot 012A
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house