Converted · legalization · Bayview Hunters Point

1179 Palou Ave

In progress+3 units on this lot · now 411 permits

Abate dcp 2023001790enf & nov202297314: legalize udu #1 unit "1179a" per four-plex density. Exception. 1/f: legalize udu #2 as a "1179b" per state program. Legalize udu #3 as unit "1179c" per ordinance 43-14/sec 207. 3. 2. Whole house renovations include new lighting systems, electrical receptacles,.

filed Nov 2023issued Feb 2026 · permit wait 2 years 3 months8 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$529,129 for 3 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
2 years 3 months
filed → issued
Build time
in progress
issued → completed
Builder
No contractor listed

Permits in this project

PermitWhatWhenDeclared
ADU permitAbate dcp 2023001790enf & nov202297314: legalize udu #1 unit "1179a" per four-plex density. Exception. 1/f: legalize udu #2 as a "1179b" per state program. Legalize udu #3 as unit "1179c" per ordinance 43-14/sec 207. 3. 2. Whole house renovations include new lighting systems, electrical receptacles,.
202311301655
filed Nov 2023 · issued Feb 2026$529kcity record
AddressAddressing permit only: purpose of this permit is to establish three subaddresses for the property 1179 palou ave, formally recognizing units a, b and c.
202604169568
filed Apr 2026 · issued Apr 2026—city record
ElectricalElectrical service upgrade 200a 5-meter overhead.
EW202604204367
Apr 20, 2026 → Jul 7, 2026—
ElectricalConversion single family building into 4-unit building. Rewiring to separate loads to be metered separately with individual meters. Eliminating all remaining knob and tube wiring.
EW202605064766
May 6, 2026 → Jul 7, 2026—
ElectricalOnline electrical permit: 60 of buildings of 6 dwelling units or less. Modification of an existing fire alarm system by upgrading the fire panel, update all existing devices to be compatible with new facp and provide low frequency sounders in all sleeping areas to meet.
E202605201074
May 20, 2026—
ElectricalUnit 1179a palou ave. New unit re-wiring to be on separate meter, eliminating knob and tube wiring.
EW202605215076
May 21, 2026 → Jul 7, 2026—
ElectricalUnit 1179b palou ave. New unit re-wiring to be on separate meter, eliminating knob and tube wiring.
EW202605215077
May 21, 2026—
ElectricalUnit 1179c palou ave. New unit re-wiring to be on separate meter, eliminating knob and tube wiring.
EW202605215078
May 21, 2026—
PlumbingWork category: 2pb; legalized units with existing plumbing, 1 new bathroom, 1 water heater relocation, 1-1/4 water pipe size upgrade.
PW20260426436
Apr 26, 2026—
PlumbingWork category: 4pb; new fire sprinkler system thru out, total 37 heads & 2 " fire service.
PW20260504653
May 4, 2026—
PlumbingInstall 9 merino mono heatpump systems at locations property.
PM20260717280
Jul 17, 2026 → Sep 2, 2026—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 4757, lot 049
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"legalize udu #1 unit "1179a" per four-plex density. exception. 1/f: legalize udu #2 as a "1179b" per state program. legalize udu #3 as unit "1179c" per ordinance 43-14/sec 207.3.2"; Existing units: 1 → Proposed units: 4”
Claim this project or house

City record of the ADU permitProperty Information Map