Converted · ground-floor conversion · Sunset/Parkside

1262 41st Ave

In progress+2 units on this lot · now 36 permits

Add 1 bed, 1 bath, 371 sq ft unit per density at ground floor. Add 2 bed, 1 bath, 490 sq ft ADU per ca state program at ground floor. 151 sq ft added conditioned space at ground flooor.

filed Aug 2025issued May 2026 · permit wait 9 months6 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$225,000 for 2 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
9 months
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitAdd 1 bed, 1 bath, 371 sq ft unit per density at ground floor. Add 2 bed, 1 bath, 490 sq ft ADU per ca state program at ground floor. 151 sq ft added conditioned space at ground flooor.
202507291847 · S And L Remodeling And Design INC
filed Aug 2025 · issued May 2026$225kcity record
ElectricalCommon area: upgrade main panelk to 200 amps. Install 3 subpanels dedicated to each unit.
E202607021930
Jul 2, 2026—
ElectricalInstall one refrigerator outlet and install two lights.
E202607021931
Jul 2, 2026—
ElectricalInstall kitchen outlers. Install 4 lights. Install 6 oiutlets in living room.
E202607021932
Jul 2, 2026—
PlumbingInstall (2) mini splits for two units.
PM20260702982
Jul 2, 2026—
PlumbingInstall new ktichen sink, install new laundry, new gas line laundry. Connect underground abs pipe for existing sewer.
PP20260702981
Jul 2, 2026—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1710, lot 032
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"add 2 bed, 1 bath, 490 sq. ft. adu per ca state program at ground floor"; units 1 → 3”