Converted · ground-floor conversion · Hayes Valley

1290 Grove St

In progress+4 units on this lot · now 4016 permits

Add (4) units (#37-40) @ ground floor per ord #162-16. Convert existing storage & garage space to new dwelling units within existing envelope. New bedrooms, kitchens, baths, plumbing, electrical & structural. New washer/dryers & dishwashers, new windows facing street. Fire alarm & sprinkler under separate permit.

filed Feb 2020issued Nov 2021 · permit wait 1 year 9 months5 years since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$885,200 for 4 ADUs
one permit, 4 units; not a per-unit price
Permit wait
1 year 9 months
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitAdd (4) units (#37-40) @ ground floor per ord #162-16. Convert existing storage & garage space to new dwelling units within existing envelope. New bedrooms, kitchens, baths, plumbing, electrical & structural. New washer/dryers & dishwashers, new windows facing street. Fire alarm & sprinkler under separate permit.
202002043526 · Sandbank Construction INC
filed Feb 2020 · issued Nov 2021$800kcity record
RevisionRevision to approved ADU permit 202002043526. Remove all 4 adus and replace garages to original condition. New electrical room. New common laundry. Comply with nov 202293711 item 2-7.
202509155327 · cites 202002043526 · Sandbank Construction INC
filed Sep 2025 · issued Nov 2025$10kcity record
Related permitUpgrade e) fire alarm system to comply with sffc sec 1103. 7. 6. 1 to meet 75 db in all sleeping areas.
202510238011 · San Francisco Fire Protection
filed Oct 2025 · issued Oct 2025 · done Feb 2026$75kcity record
ElectricalUnit 606: new bedroom, new kitchen cabinets and new plumbing fixtures. Add washer/dryer.
E202208242073
Aug 24, 2022 → Dec 2, 2022—
ElectricalUnit 204: correct wiring from main panel to sub panel. Comply with eid nov 202532547.
E202508275109
Aug 27, 2025—
ElectricalUnit 204: correct wiring from main panel to sub panel. Comply with eid nov 202532547 install new wiring to accommodate 50-60a breaker.
EW202509159424
Sep 15, 2025—
ElectricalOnline electrical permit: 4 of 4 - 9 floors. 36 units 7 story building upgrade existing fas to comply with sffc sec. 1103. 7. 6. 1 sar pa 202510238011.
E202511187230
Nov 18, 2025—
ElectricalPa# 202510238011 ref# e202511187230.
EW202512091377
Dec 9, 2025—
ElectricalUpgrade main electrical service from existing to 600amps 3phse 240volts all new meter main and new service disconnect all in new location.
EW202512151547
Dec 15, 2025—
ElectricalPa# 202510238011 ref# e202511187230.
EW202601121997
Jan 12, 2026 → Feb 26, 2026—
ElectricalProvide and install a new dedicated circuit for the garage door opener. Install a new dedicated circuit for the gas washer and dryer.
EW202607276690
Jul 27, 2026—
PlumbingUnit 606: new bedroom, new kitchen cabinets and new plumbing fixtures. Add washer/dryer.
PP20220824696
Aug 24, 2022 → Dec 2, 2022—
PlumbingWork category: 8p; remove existing dhws boiler and install 2x hot water heaters and connect to existing piping.
PW20230914151
Sep 14, 2023 → Dec 12, 2023—
PlumbingWork category: 1p; new 6" sewer from rain water connection to curb with new trap.
PW20241118192
Nov 18, 2024 → Nov 21, 2024—
PlumbingWork category: 2pa; install 2 new drains in garage area. Finish out laundry area.
PW20260107652
Jan 7, 2026 → Jul 22, 2026—
PlumbingWork category: 8p; remove existing on-demand hot water heater and strike from sfdbi. Furnish and install navien on-demand hot water heater and connect to existing piping.
PW20260320518
Mar 20, 2026 → Mar 25, 2026—
2 other permits on this lot during the project, not counted
OtherUnit #606: renovation of 1 unit on the 7th floor new bedroom. New kitchen cabinets and plumbing fixtures. New dishwasher & washer/ dryer. New lighting at existing j-boxes. No change to mechanical. No exterior work. No fire alarm, or sprinkler. No structural work.
202206136203 · Brighter Bay Builders INC
filed Jun 2022 · issued Aug 2022 · done Dec 2022$65kcity record
OtherInstall soil voc vapor intrusion mitigation system per prepared plans & specifications. Includes: installation of vapor barrier and vent piping, vent risers/roof terminations, and related components as shown on submitted plans. Not visible from street.
202605221797 · Advanced Construction Technologies LLC
filed May 2026 · issued May 2026$40kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1181, lot 014B
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house

City record of the ADU permitProperty Information Map