Attached · Sunset/Parkside

1343 38th Ave

Completed Jun 2024+1 unit on this lot · now 28 permits

Remodel existing first level extend existing rear exterior wall to accomodate a new 1 bed 1 bath "streamlined" ADU. ADU is occupying existing non-conditioned space and new addition space. No conditioned occupied spaced for main residence has been converted for ADU. Remodel existing 2nd level & existing 3rd level.

filed Sep 2021issued Dec 2022 · permit wait 1 year 3 monthscompleted Jun 2024 · built in 1 year 6 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$420,000 + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
1 year 3 months
filed → issued
Build time
1 year 6 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitRemodel existing first level extend existing rear exterior wall to accomodate a new 1 bed 1 bath "streamlined" ADU. ADU is occupying existing non-conditioned space and new addition space. No conditioned occupied spaced for main residence has been converted for ADU. Remodel existing 2nd level & existing 3rd level.
202109017637 · Urban Builder General Contracting INC
filed Sep 2021 · issued Dec 2022 · done Jun 2024$420kcity record
RevisionRevision to 202109017637-s1. New stair orientation for approved deck & as-built framing revisions.
202308094031 · cites 202109017637 · Urban Builder General Contracting INC
filed Aug 2023 · issued Aug 2023 · done Jun 2024—city record
ElectricalComp[lete house remodel. New 200amp three meter service. Lower ADU unit.
EW202303089541
Mar 8, 2023 → Oct 17, 2023—
ElectricalInfrastructure for future pv system including but not limited to stanchions, conduit and wiring.
EW202306061659
Jun 6, 2023 → May 9, 2024—
ElectricalPv plan 6379. 24 pv modules, 425 / 1000 watts per module, 10. 2 (dc) kw.
E202401161798
Jan 16, 2024 → May 8, 2024—
PlumbingWork category: 2pb; install all new plumbing install new under ground plumbing install hot & cold water system install hot water heater install new gas lines.
PW20230503742
May 3, 2023 → Mar 18, 2024—
PlumbingWork category: 1m; install carrier heat pump heating and cooling full house system.
PMW20230627074
Jun 27, 2023 → Mar 18, 2024—
PlumbingWork category: 1p; 1 shower pan first floor 1 shower pan 3rd floor.
PW20231114628
Nov 14, 2023 → Dec 19, 2023—
1 other permit on this lot during the project, not counted
OtherExisting fireplace flue repair: removal of existing terra-cotta flue tiles and replacing with listed class-a metal chimney system. Repair only, not reconstruction.
202306140047 · Okells Prefab Fireplace
filed Jun 2023 · issued Jun 2023 · done Jun 2023$10kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1793, lot 009
Why we call it an ADU
SF DBI flagged the permit as an ADU.