Converted · ground-floor conversion · West of Twin Peaks

137 Chilton Ave

In progress+1 unit on this lot · now 21 permit

Convert 1/f and part of existing garage to ADU. The existing 2/f will remain separate residential unit. No addition is proposed, all work to be within the footprint of existing building rear 2/f deck and portions of rear structure will be repaired and replaced inkind as required. New windows at 1/f.

filed Dec 2025issued Jul 2026 · permit wait 7 months4 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$225,000
declared on the ADU permit
Permit wait
7 months
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitConvert 1/f and part of existing garage to ADU. The existing 2/f will remain separate residential unit. No addition is proposed, all work to be within the footprint of existing building rear 2/f deck and portions of rear structure will be repaired and replaced inkind as required. New windows at 1/f.
202511038747 · Daylight Construction
filed Dec 2025 · issued Jul 2026$225kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 6758, lot 023
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"convert 1/f and part of (e) garage to adu. the (e) 2/f will remain separate residential unit"; units 1 → 2”
Claim this project or house

City record of the ADU permitProperty Information Map