Converted · legalization · Bayview Hunters Point

1408A Shafter Ave

Completed Apr 2026+2 units on this lot · now 311 permits

To comply with dbi nov# 201883174, 201887331, 202177722, 202178670, 202178669, and planning complaint # 2021-005087enf. Add one g/f and one 2/f unit per planning code sec. 207(c)(8). Legaliza 2/f rear addition. Verify 1-hr ceiling between floors, between units & 1-hr walls next to garage.

filed Sep 2022issued Oct 2024 · permit wait 2 years 2 monthscompleted Apr 2026 · built in 1 year 5 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$142,109 for 2 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
2 years 2 months
filed → issued
Build time
1 year 5 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitTo comply with dbi nov# 201883174, 201887331, 202177722, 202178670, 202178669, and planning complaint # 2021-005087enf. Add one g/f and one 2/f unit per planning code sec. 207(c)(8). Legaliza 2/f rear addition. Verify 1-hr ceiling between floors, between units & 1-hr walls next to garage.
202209061924 · B W H Builder INC
filed Sep 2022 · issued Oct 2024 · done Apr 2026$110kcity record
SprinklersInstall new fire sprinkler system per nfpa 13 throughout the building, including 2" underground fire service total = 22 heads.
202508203528 · Magnum Construction Group INC
filed Aug 2025 · issued Aug 2025 · done Mar 2026$26kcity record
SprinklersInstallation of a new sprinkler monitoring system, sprinkler waterflow and supervisory system. Ref sprinkler permit 202508203528.
202509175548 · Crime Watch Security Sys Llc
filed Sep 2025 · issued Sep 2025 · done Mar 2026$6,000city record
ElectricalAdd subpanel and electrical for water heater.
E202506303559
Jun 30, 2025 → Mar 18, 2026—
ElectricalAdd 100amp main panel and sub panel.
E202506303555
Jun 30, 2025 → Mar 18, 2026—
ElectricalAdd sub panel and circuit for water heater.
E202506303558
Jun 30, 2025—
ElectricalUpgrade existing services panel to 400amp 120/240v single phase with new grounding. Adding three meters to the 400amp service panel. Address( 1408b, 1408c, house).
EW202507147972
Jul 14, 2025—
ElectricalOnline electrical permit: 60 of buildings of 6 dwelling units or less. Installation of a sprinkler monitoring system.
E202509135589
Sep 13, 2025 → Mar 12, 2026—
PlumbingUnits 1408, 1408a, 1408b- add 3 furnaces.
PM20250630169
Jun 30, 2025 → Jan 29, 2026—
PlumbingUnits 1408, 1408a, 1408b- remodel 3 bathrooms and 3 kitchens.
PP20250630167
Jun 30, 2025 → Mar 10, 2026—
PlumbingWork category: 4pb; install new fire sprinkler system per nfpa 13 throughout the building, including 2" underground fire service total = 22 heads.
PW20250902774
Sep 2, 2025 → Mar 12, 2026—
1 other permit on this lot during the project, not counted
OtherReroofing using shingles. No hot works.
202509185596 · Gtm Roofing Services LLC
filed Sep 2025 · issued Sep 2025$12kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 4789, lot 002C
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"add one g/f and one 2/f unit per planning code sec. 207(c)(8). legaliza 2/f rear addition" ; units 1 \u2192 3”
Claim this project or house

City record of the ADU permitProperty Information Map