Converted · ground-floor conversion · Inner Sunset

1430A 19th Ave

Completed Dec 2023+1 unit on this lot · now 211 permits

1st floor -a. D. U. Per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. Separate submittal for fire sprinkler and structural.

filed May 2021issued Feb 2022 · permit wait 9 monthscompleted Dec 2023 · built in 1 year 10 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$192,404
declared across 3 permits: the ADU permit plus its sub-permits
Permit wait
9 months
filed → issued
Build time
1 year 10 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permit1st floor -a. D. U. Per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. Separate submittal for fire sprinkler and structural.
202105110103 · Yes General Construction Builder
filed May 2021 · issued Feb 2022 · done Dec 2023$173kcity record
SprinklersInstall new fire sprinkler for ADU and ground floor only. Underground fire service also included. Ref building pa# 202105110103.
202202288823 · cites 202105110103 · Safe Assurance Fire Protection INC
filed Feb 2022 · issued Feb 2022 · done Jan 2023$15kcity record
SprinklersInstallation of a new sprinkler monitoring system. Install a new silent knight ifp-75 fire alarm control unit. New starlink wireless communicator, 1 smoke detector, 1 manual pull station, 3 monito modules. Ref pa# 202105110103. Sprinkler pa# 202202288823.
202211146433 · cites 202105110103 · Rf Fire Alarm Llc
filed Nov 2022 · issued Nov 2022 · done Jan 2023$4,500city record
ElectricalRemodeling one kitchen, two bathroom, one laundry room 20 lights, 15 switches, 15 receptacles, 2 fans, 1 g/d, 5 smoke detectors.
E202203299296
Mar 29, 2022 → Mar 10, 2023—
ElectricalNew 200a services.
E202208181980
Aug 18, 2022 → Mar 8, 2023—
ElectricalNew 200a services.
E202208181979
Aug 18, 2022 → Mar 8, 2023—
ElectricalInstall new sprinkler monitoring system.
EW202212278023
Dec 27, 2022 → Jan 3, 2023—
PlumbingWork category: 4pa; install new fire sprinkler system for ADU and entire ground floor. Underground fire service also part of scope of work.
PW20220308445
Mar 8, 2022 → Nov 15, 2022—
PlumbingWork category: 1m; install new hydronic heat system for unit #1430, install new hot water fan coil unit for #1430a install vent pipe.
PMW20230802024
Aug 2, 2023 → Aug 18, 2023—
PlumbingFor unit a; remodeling 1 kitchen, 2 bathroom, one laundry room and two shower pan. Reference pp20220329012.
PP20230802269
Aug 2, 2023 → Aug 11, 2023—
PlumbingRemodeling 3 bathroom, including 2 shower pans, and remodeling 1 kitchen. Ref: pp20210421438.
PP20230802270
Aug 2, 2023 → Aug 18, 2023—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1835, lot 038
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house

City record of the ADU permitProperty Information Map