Converted · ground-floor conversion · Russian Hill
1449 Hyde St
In progress+1 unit on this lot · now 76 permits
Conversion of existing unconditioned storage space into new 775sf ADU with 1 bed & 1 bath, storage room, trash toter enclosure & 1hr hallway connecting the ADU to building foyer. Newwood framed steps on existing sloped concrete floor. Replace rear yard deck with new.
filed Feb 2025issued Feb 2026 · permit wait 11 months9 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$231,010
declared on the ADU permit
Permit wait
11 months
filed → issued
Build time
in progress
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Conversion of existing unconditioned storage space into new 775sf ADU with 1 bed & 1 bath, storage room, trash toter enclosure & 1hr hallway connecting the ADU to building foyer. Newwood framed steps on existing sloped concrete floor. Replace rear yard deck with new. 202501138193 · Urban Nest Construction | filed Feb 2025 · issued Feb 2026 | $231k | city record |
| Electrical | Unit 1: upgrade electrical main panel to 100amp. Install new sub-panel (100amp) 20/40 circuits. Install new recess lights. Install kitchen gfci outlet, heater outlet. 13 lights, 13 switches, 30 receptcles, 1 dishwasher, 1 disposal, 1 range. E202602239187 | Feb 23, 2026 → Apr 20, 2026 | — | |
| Plumbing | Work category: 1p; gas tag for meter release. PW20260219736 | Feb 19, 2026 | — | |
| Plumbing | Work category: 1p; gas service for apt#4. PW20260220775 | Feb 20, 2026 | — | |
| Plumbing | Unit 1: bath room remodeling, kitchen remodeling and new laundry. Shower tub to shower pan (built-up). PP20260223542 | Feb 23, 2026 → Apr 15, 2026 | — | |
| Plumbing | Work category: 1p; gas service for apt#6. PW20260330724 | Mar 30, 2026 | — |
1 other permit on this lot during the project, not counted
| Other | Unit 1- kitchen and bathroom remodel to include convert tub tor shower. New laundry room, electrical main panel upgrade from 50amps to 100amps, painting interior and refinish hardwood floor. Add dishwasher. 202602236301 · Vizcon Construction Company INC | filed Feb 2026 · issued Feb 2026 · done Apr 2026 | $80k | city record |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 0186, lot 003
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.