Converted · ground-floor conversion · Bernal Heights
154 Tiffany Ave
Completed Mar 2025+1 unit on this lot · now 34 permits
Rev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. Deferred sprinkler design per ab-20 under separate permit. Ground floor sprinklered to nfpa 13d voluntarily.
filed Aug 2024issued Sep 2024 · permit wait 33 dayscompleted Mar 2025 · built in 6 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$4,347
declared on the ADU permit
Permit wait
33 days
filed → issued
Build time
6 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Rev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. Deferred sprinkler design per ab-20 under separate permit. Ground floor sprinklered to nfpa 13d voluntarily. 202408148612 | filed Aug 2024 · issued Sep 2024 · done Mar 2025 | — | city record |
| Related permit | Replace sprinker in the garage and corridor with new residential heads. Total 7 heads. Ref pa# 202408147612. 202411225541 · Cj Plumbing INC | filed Nov 2024 · issued Nov 2024 · done Feb 2025 | $4,347 | city record |
| Plumbing | Work category: 1p; ref # pw 20210124097 lnstall new fire sprinkler system. PW20241129442 | Nov 29, 2024 → Dec 31, 2024 | — | |
| Plumbing | Renewal pp2023-0925192: to obtain final inspection same scope of work. PP20250123137 | Jan 23, 2025 → Feb 26, 2025 | — |
These permits also cite 201910023377, 202408147612, which the city filed before our records begin.
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 6597, lot 045
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.