Converted · ground-floor conversion · Nob Hill
1624 Sacramento St
In progress+2 units on this lot · now 179 permits
Addition of two (2) accsessory dwelling units to an existing fifteen (15) unit building per ordinance 162-16 for a total of seventeen (17) units. The two (2) proposed dwellings are located within the existing building envelope at the first floor.
filed Nov 2020issued Apr 2022 · permit wait 1 year 5 months4 years 6 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$128,700 for 2 ADUs
one permit, 2 units; not a per-unit price
Permit wait
1 year 5 months
filed → issued
Build time
in progress
issued → completed
Builder
Wickman Development And ConstructionAlso on this project: Rain Defense, Brighter Bay Builders INC
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Addition of two (2) accsessory dwelling units to an existing fifteen (15) unit building per ordinance 162-16 for a total of seventeen (17) units. The two (2) proposed dwellings are located within the existing building envelope at the first floor. 202011209423 · Wickman Development And Construction | filed Nov 2020 · issued Apr 2022 | $129k | city record |
| Electrical | Wiring of new laundry room. EW202208105227 | Aug 10, 2022 | — | |
| Electrical | Upgrade the existing fire alarm for the 15 unit building to comply with 1103. 7. 6. 1. EW202306081707 | Jun 8, 2023 → Jul 21, 2023 | — | |
| Electrical | Unit 7: install one new clothes washer and dryer. 2 switches, 2 receptcles. E202308258946 | Aug 25, 2023 → Oct 13, 2023 | — | |
| Plumbing | Apt 7: replace shower valve. PP20220622546 | Jun 22, 2022 → Jul 12, 2022 | — | |
| Plumbing | Work category: 2pb; raise the 2" steam main in the corridor outside of unit #17, up into the joist space, from the corridor out side of unit #15, over to the new beam in the living/kitchen/sleeping room of unit #17, then ropping down along side of the new beam, running into unit #16 and dropping down in the wall. We will connect to a steam riser in the ceiling of unit #17 and two steam risers in the ceiling of unit #16. We will install three buried type k insulated copper returns back to the boiler room. PW20221115598 | Nov 15, 2022 → Oct 11, 2023 | — | |
| Plumbing | Work category: 8p; installation of two tankless 199k btu rinnai water heaters to work with existing 119 gallon storage tank. PW20221216400 | Dec 16, 2022 → Mar 9, 2023 | — | |
| Plumbing | Unit 7: plumbing work for installation of one new clothes washer/dryer. PP20230825655 | Aug 25, 2023 → Oct 13, 2023 | — | |
| Plumbing | Unit#7: install new fixtures for kitchen and bathroom. PP20231013489 | Oct 13, 2023 → Oct 13, 2023 | — |
2 other permits on this lot during the project, not counted
| Other | Reroofing. 202305047133 · Rain Defense | filed May 2023 · issued May 2023 · done Jun 2023 | $58k | city record |
| Other | Unit #7: install 1 new clothes washer & dryer. No wall demo. 202307101789 · Brighter Bay Builders INC | filed Jul 2023 · issued Aug 2023 · done Oct 2023 | $6,000 | city record |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 0621, lot 008
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.