Converted · ground-floor conversion · Marina

2335 North Point St

In progress+1 unit on this lot · now 34 permits

Install accessory dwelling unit (ADU) 672 SF at the rear portion of the ground floor no structural walls or members removed (per state ADU program).

filed Aug 2023issued Apr 2024 · permit wait 8 months2 years 7 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$194,000
declared on the ADU permit
Permit wait
8 months
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitInstall accessory dwelling unit (ADU) 672 SF at the rear portion of the ground floor no structural walls or members removed (per state ADU program).
202308104143 · Skycore Construction
filed Aug 2023 · issued Apr 2024$194kcity record
RevisionRevision to pa#202308104143: replace sheets a-6 and a-7 with t-24. 1 with t-24. 2 remove the following hers testing requirement. Quality insulation instullation. Duct leakage testing. Duct located entirely in conditioned space.
202409050108 · cites 202308104143 · Skycore Construction
filed Sep 2024 · issued Sep 2024—city record
ElectricalInstall ADU (672 ft) at the rear portion of the ground floor. No structural walls or members removed. (reference bpa#202308104143).
E202405154392
May 15, 2024 → Aug 7, 2024—
PlumbingInstall ADU (672 ft) at the rear portion of the ground floor. No structural walls or members removed. (reference bpa#202308104143) added a second bathroom/kitchen/laundry. Replace existing wh & boiler with high efficiency tankless wh & radiant floor system.
PP20240515852
May 15, 2024 → Jun 11, 2024—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 0923, lot 036
Why we call it an ADU
SF DBI flagged the permit as an ADU.