Converted · ground-floor conversion · Marina
2335 North Point St
In progress+1 unit on this lot · now 34 permits
Install accessory dwelling unit (ADU) 672 SF at the rear portion of the ground floor no structural walls or members removed (per state ADU program).
filed Aug 2023issued Apr 2024 · permit wait 8 months2 years 7 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$194,000
declared on the ADU permit
Permit wait
8 months
filed → issued
Build time
in progress
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Install accessory dwelling unit (ADU) 672 SF at the rear portion of the ground floor no structural walls or members removed (per state ADU program). 202308104143 · Skycore Construction | filed Aug 2023 · issued Apr 2024 | $194k | city record |
| Revision | Revision to pa#202308104143: replace sheets a-6 and a-7 with t-24. 1 with t-24. 2 remove the following hers testing requirement. Quality insulation instullation. Duct leakage testing. Duct located entirely in conditioned space. 202409050108 · cites 202308104143 · Skycore Construction | filed Sep 2024 · issued Sep 2024 | — | city record |
| Electrical | Install ADU (672 ft) at the rear portion of the ground floor. No structural walls or members removed. (reference bpa#202308104143). E202405154392 | May 15, 2024 → Aug 7, 2024 | — | |
| Plumbing | Install ADU (672 ft) at the rear portion of the ground floor. No structural walls or members removed. (reference bpa#202308104143) added a second bathroom/kitchen/laundry. Replace existing wh & boiler with high efficiency tankless wh & radiant floor system. PP20240515852 | May 15, 2024 → Jun 11, 2024 | — |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 0923, lot 036
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.