Converted · interior conversion · Mission
2507A Bryant St
In progress+3 units on this lot · now 528 permits
Create 3 ADU's per ordinance 162-16 within existing live/work unit. Add dormer per za bulletin no. 3. Add new stairs on 1/f and alter 1st story as indicated in drawings. Reconfigure exit stair from basement of 2501 bryant under deferred permit. Rev to g/f ADU units under pa201903145204.
filed Sep 2020issued Jun 2022 · permit wait 1 year 9 months4 years 5 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$219,057 for 3 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
1 year 9 months
filed → issued
Build time
in progress
issued → completed
Builder
No contractor listed
Also on this project: All Systems Approved INC, Fire & Security & Alarm Co, Axel8 Construction LLC, E N A Construction INC
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Create 3 ADU's per ordinance 162-16 within existing live/work unit. Add dormer per za bulletin no. 3. Add new stairs on 1/f and alter 1st story as indicated in drawings. Reconfigure exit stair from basement of 2501 bryant under deferred permit. Rev to g/f ADU units under pa201903145204. 202009214663 | filed Sep 2020 · issued Jun 2022 | $150k | city record |
| Sprinklers | Augment an nfpa 13r, automatic wet pipe, fire sprinkler system in 3 ADU's only on the 1st floor only on a. 202307172321 · All Systems Approved INC | filed Jul 2023 · issued Sep 2023 | $42k | city record |
| Revision | As-builts to permit 202111233015 due to interior remodeling in ADU units "e" and "d" on 1/f at 2509 bryant st. And in ADU unit "c" on 1/f at 2829 23rd st. Existing lf horns will be replaced with ceiling mount and tie-in to existing circuits. Ref permits 202208301564 and 202208301600. 202312051941 · Fire & Security & Alarm Co | filed Dec 2023 · issued Dec 2023 · done Sep 2025 | $13k | city record |
| Sprinklers | Unit #c: new nfpa-13 automatic, wet pipe, fire sprinkler system in 1 ADU only on the first floor only on a four story building. Ref# 202307172321. 202401264715 · All Systems Approved INC | filed Jan 2024 · issued Jan 2024 · done Feb 2025 | $15k | city record |
| Related permit | To obtain a final inspection for work approved under pa# 202307172321. All work complete. 202510177619 · All Systems Approved INC | filed Oct 2025 · issued Oct 2025 | — | city record |
| Electrical | Kitchen and bath remodel. 8 lights, 4 switches, 4 receptacles, 2 fans, 1 d/w, 1 range, 2 s/d. E202302165101 | Feb 16, 2023 → Sep 25, 2023 | — | |
| Electrical | Online electrical permit: category 4a: installation of fire warning and controlled devices of up to 2, 500 ft². Adding low frequency horns to an existing system. E202312071035 | Dec 7, 2023 | — | |
| Electrical | Online electrical permit: 60 of buildings of 6 dwelling units or less. Adding low frequency horns to an existing system. E202312071036 | Dec 7, 2023 → Sep 9, 2025 | — | |
| Electrical | Online electrical permit: category 4a: installation of fire warning and controlled devices of 10, 001 - 30, 000 ft². Adding low frequency horns to an existing system. E202312071034 | Dec 7, 2023 | — | |
| Electrical | Add 3 meters to existing service for ADU's. EW202404017713 | Apr 1, 2024 → Jun 7, 2024 | — | |
| Electrical | Renewal of permit# e202210203093 (original scope: unit #a: brand new ADU. Rough and finish electrical. ). E202508134725 | Aug 13, 2025 | — | |
| Electrical | Renew permit# e202210203094 (original scope: brand new ADU. Rough and final electrical. ) for final inspection. E202508225008 | Aug 22, 2025 → Sep 9, 2025 | — | |
| Electrical | Reference e202210203093 for ADU unit# d. 2509 unit a was split into units d and e for ADU. (for final inspection ). E202508225009 | Aug 22, 2025 → Sep 5, 2025 | — | |
| Electrical | Reference e202210203093 for ADU unit # e. 2509 bryant was split into units d and e for ADU. (for final inspection). E202508225010 | Aug 22, 2025 → Sep 5, 2025 | — | |
| Plumbing | Work category: 1p; sewer main repair. PW20221007542 | Oct 7, 2022 → Oct 31, 2022 | — | |
| Plumbing | Kitchen and bathroom remodel. One shower pan. PP20230216568 | Feb 16, 2023 → Sep 22, 2023 | — | |
| Plumbing | Replace existing gas heater. PM20230404280 | Apr 4, 2023 → Sep 22, 2023 | — | |
| Plumbing | Rev to pmpm20230404280: replace existing non -functioning heater with new force air unit in existing storage room per pid request. PM20230505792 | May 5, 2023 → May 11, 2023 | — | |
| Plumbing | New nfpa-13, automatic wet pipe, fire sprinkler system in a 1 ADU only on the first floor oly on a 4 story building. PP20240126027 | Jan 26, 2024 → Oct 29, 2025 | — | |
| Plumbing | Work category: 1m; installing flue and two fireplaces. This is a renewal permit for expired permit #pmw20231106418. PMW20241111031 | Nov 11, 2024 → Nov 15, 2024 | — | |
| Plumbing | Renew pm20231220530 and pm20231130260 for final inspections. PM20250813112 | Aug 13, 2025 → Oct 17, 2025 | — | |
| Plumbing | Renew pm20231220528 and pm20231130261 for final inspection. PM20250813111 | Aug 13, 2025 → Sep 9, 2025 | — | |
| Plumbing | Renewal of permits# pp20231220527 and pp20231129245. PP20250813109 | Aug 13, 2025 → Sep 9, 2025 | — | |
| Plumbing | Renewal of permits# pp20231220529 and pp20231129244. PP20250813108 | Aug 13, 2025 → Sep 5, 2025 | — | |
| Plumbing | Unit #c. New water heater installataion. PP20250930999 | Sep 30, 2025 → Oct 9, 2025 | — | |
| Plumbing | Unit # d & e. New water heater installation in each unit. PP20250930001 | Sep 30, 2025 → Oct 9, 2025 | — | |
| Plumbing | To obtain final inspections for work approved under previously approved permit pw20230808161. PP20251014217 | Oct 14, 2025 → Oct 29, 2025 | — | |
| Plumbing | Work category: 1p; we correct three water heaters installation by others. (2831-35 23rd st). PW20251107416 | Nov 7, 2025 | — |
9 other permits on this lot during the project, not counted
| Other | Revision to bpa#201903145204 to provide for future work as approved by planning per #202/0921/4663. Modified interior layout & windows, requesting exposure waiver for unit "e"; elimination of shear wall @ grid line 4; newshear wall @ grid line 1. 202208301564 · Axel8 Construction LLC | filed Aug 2022 · issued Jun 2023 · done Dec 2025 | $9,000 | city record |
| Other | Add ventless washer/ dryer to existing closet. 202301130177 · Axel8 Construction LLC | filed Jan 2023 · issued Feb 2023 · done Sep 2023 | $3,800 | city record |
| Other | 1. Rehabilitate one existing kitchen in kind. 2. Rehabilitate one existing bathroom in kind. 3. No structural work in proposed. 202302162138 · Axel8 Construction LLC | filed Feb 2023 · issued Feb 2023 · done Sep 2023 | $77k | city record |
| Other | Provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. Ref pmw20231106418 - plum/mech. No change to approved unit sizes or location. 202311140754 · Axel8 Construction LLC | filed Nov 2023 · issued Nov 2023 | $10k | city record |
| Other | Replace dry-rotted treads & stringers of exterior rear stairs less than 50% repair. 202406174639 · E N A Construction INC | filed Jun 2024 · issued Jul 2024 · done Apr 2025 | $250 | city record |
| Other | To obtain final inspection for work approved under 201903145203 and 202208301600. 202508294282 · Axel8 Construction LLC | filed Aug 2025 · issued Aug 2025 · done Dec 2025 | — | city record |
| Other | Revision to 201903145204 for dropped floor in unit d to comply with nov 202301973. 202510076868 · Axel8 Construction LLC | filed Oct 2025 · issued Oct 2025 · done Dec 2025 | — | city record |
| Other | Repair foundation at existing garage, work shop, storage space, trash room and bike storage. 202512222366 · E N A Construction INC | filed Dec 2025 · issued Jan 2026 · done Apr 2026 | $10k | city record |
| Other | Administrative ref pa 202512222366 remove deferred permits fire alarm system & fire sprinklers. 202604089087 · E N A Construction INC | filed Apr 2026 · issued Apr 2026 · done Apr 2026 | — | city record |
These permits also cite 201903145204, 201903145203, which the city filed before our records begin.
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 4209, lot 041
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.