Converted · ground-floor conversion · Inner Richmond
259 7th Ave
Completed Mar 2026+1 unit on this lot · now 38 permits
To establish state ADU on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + ADU).
filed Jan 2024issued Aug 2024 · permit wait 7 monthscompleted Mar 2026 · built in 1 year 7 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$278,000
declared across 2 permits: the ADU permit plus its sub-permits
Permit wait
7 months
filed → issued
Build time
1 year 7 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | To establish state ADU on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + ADU). 202401244517 · Wilko Builders LLC | filed Jan 2024 · issued Aug 2024 · done Mar 2026 | $274k | city record |
| Related permit | Voluntry structural strenthening. New walls windows & doors at garage remove e) brick chimney. Ref pa 202401244517. 202409171004 · cites 202401244517 · Wilko Builders LLC | filed Sep 2024 · issued Sep 2024 · done Feb 2026 | $4,000 | city record |
| Address | Addressing permit only: add a new address 259 a 7th ave. Link to apn 1426/013. Ref pa #2024-0124-4517. 202604270135 · cites 202401244517 | filed Apr 2026 · issued Apr 2026 | — | city record |
| Electrical | Run dedicated electric circuit for new heat pump water heater in garage. E202408286559 | Aug 28, 2024 → Mar 11, 2026 | — | |
| Electrical | Install electrical for ADU at the 1st floor. Install new 320 amp 3 meter section. Service no and size (750 aluminum 320amp) panelboards/ sweithboards (3-125 amp #2) (15 lights, 4 switches, 15 receptacles, 1 dishwasher, 1 garbage disposal, 1 microwave, 1 range and 3 smoke detectors). E202409046650 | Sep 4, 2024 → Mar 3, 2026 | — | |
| Electrical | Two dedicated circuit for water heater, dedicated circuit for furnace. E202410177612 | Oct 17, 2024 → Mar 11, 2026 | — | |
| Plumbing | Rewew pm20240828638: hvac mini split system. PM20260226635 | Feb 26, 2026 → Mar 3, 2026 | — | |
| Plumbing | To renew pp20240828636 for final inspection only. PP20260226636 | Feb 26, 2026 → Mar 3, 2026 | — |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 1426, lot 013
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.