Converted · ground-floor conversion · Mission

2874 16th St

Completed May 2026+4 units on this lot · now 1021 permits

Repair building and remodel existing units. The existing non-conforming basement level will be excavated to add four new ADU's per ordinance 162-16. The existing damaged egress staircase in the rear yard will be replaced & relocated. The existing dry-rotted staircase at the front will be repaired in kind.

filed Sep 2020issued Mar 2023 · permit wait 2 years 6 monthscompleted May 2026 · built in 3 years 1 month
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$1,901,601 for 4 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
2 years 6 months
filed → issued
Build time
3 years 1 month
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitRepair building and remodel existing units. The existing non-conforming basement level will be excavated to add four new ADU's per ordinance 162-16. The existing damaged egress staircase in the rear yard will be replaced & relocated. The existing dry-rotted staircase at the front will be repaired in kind.
202009214648 · Delsur Construction
filed Sep 2020 · issued Mar 2023 · done May 2026$1.8Mcity record
Related permitNew fire sprinker systems and underground forthe building per nfda 13 ref pa# 202009214648.
202409201230 · cites 202009214648 · Lowy R Fire Protection INC
filed Sep 2024 · issued Sep 2024 · done Oct 2025$78kcity record
Related permitUpgrade existing fire alarm system to comply with sffd 1103. 6. 7. 1.
202505086033 · Mcmillen Construction INC
filed May 2025 · issued May 2025 · done Mar 2026$24kcity record
Related permitTo obtain final inspection for work approved under pa# 202009214648. All work is complete.
202604270121 · cites 202009214648
filed Apr 2026 · issued Apr 2026 · done May 2026—city record
ElectricalInstall temp 100amp service.
EW202308163247
Aug 16, 2023—
ElectricalComplete rewire of unit and install new subpanel.
EW202504285980
Apr 28, 2025—
ElectricalComplete rewire of unit and install new subpanel.
EW202504285979
Apr 28, 2025—
ElectricalUpgrade existing fire alarm system to comply with sffd 1103. 6. 7. 1.
E202505142418
May 14, 2025 → Mar 27, 2026—
ElectricalInstall new wiring throughout new unit. Install new subpanel (basement unit).
EW202505216584
May 21, 2025—
ElectricalInstall new wiring throughout new unit. Install new sub panel basement unit.
EW202505216583
May 21, 2025—
ElectricalComplete rewire of unit and install of new sub panel.
EW202507218134
Jul 21, 2025—
ElectricalComplete rewire of unit and install new sub panel.
EW202507218135
Jul 21, 2025—
ElectricalInstall new wiring throughout new unit. Install new subpanel.
EW202507308405
Jul 30, 2025—
ElectricalInstall new wiring throughout new unit. Install new subpanel.
EW202507308403
Jul 30, 2025—
ElectricalRewire entire unit and install new subpanel ( basement unit).
EW202508268975
Aug 26, 2025—
ElectricalRewire entire unit and install new sub panel (basement unit).
EW202508268968
Aug 26, 2025—
ElectricalInstall 400amp main service with 10 residential meters and 1 house meter.
EW202508268976
Aug 26, 2025 → Apr 8, 2026—
PlumbingRough - in plumbing, gas lines, water supply lines, 10 tankless water heaters, sewage pump, dewatering pump, sewer lateral, water main installation, finish trim, 3 new gas meters and underground plumbing.
PP20250429944
Apr 29, 2025 → Apr 17, 2026—
PlumbingWork category: 4pb; new fire sprinkler system and underground service for 4 story residential building reference to 2024-0920-1230.
PW20250515283
May 15, 2025 → Apr 8, 2026—
Plumbing10 unit(s): 2874, 2876, 2878, 2870, 2870(a), 2872, 2872(a), 2874(a)28676(a), 2878(a) scope of wk: adding 10 heating pumps and 22 indoor minsplits.
PM20250805906
Aug 5, 2025 → Apr 20, 2026—
PlumbingWork category: 1p; new house traps and section of pipe on the sidewalk area only.
PW20250930471
Sep 30, 2025 → Oct 8, 2025—
3 other permits on this lot during the project, not counted
OtherTo obtain final inspection for work approved under pa# 201603172334 & 201606210493. All work is approved.
202604270123
filed Apr 2026 · issued Apr 2026—city record
OtherTo obtain final inspection for work approved under pa# 202003106683 & 202005217674. All work is complete.
202604270124
filed Apr 2026 · issued Apr 2026 · done May 2026—city record
OtherTo obtain final inspection for work approved under 202308013472. All work is complete.
202605060731
filed May 2026 · issued May 2026 · done May 2026—city record

These permits also cite 201603172334, 201606210493, 202003106683, 202005217674, which the city filed before our records begin.

Trade permits show what work was done and when; the city does not record who pulled them.