Converted · ground-floor conversion · Sunset/Parkside

3138A Moraga St

Completed Apr 2024+1 unit on this lot · now 29 permits

585 SF of the basement storage area will be converted into a 1 bedroom ADU.

filed Sep 2021issued May 2022 · permit wait 8 monthscompleted Apr 2024 · built in 2 years
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$151,283
declared on the ADU permit
Permit wait
8 months
filed → issued
Build time
2 years
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permit585 SF of the basement storage area will be converted into a 1 bedroom ADU.
202109077888 · Pallari Construction Incorporated
filed Sep 2021 · issued May 2022 · done Apr 2024$151kcity record
RevisionRevision to permit #202109077888. Reduction of scope from (2) bath to (1) bath, double patio door to single door.
202212198665 · cites 202109077888 · Xspace Builders INC
filed Dec 2022 · issued Dec 2022 · done May 2024—city record
ElectricalADU new outlets, new power to ADU, new lights, new panel upgrade.
E202208302150
Aug 30, 2022—
ElectricalMain panel upgrade 100a-200a, partial house rewire and two 100a sub panel installation.
EW202306121759
Jun 12, 2023 → Aug 4, 2023—
PlumbingADU addition in existing garage space. New tankless water heater, new gas range, new gas dryer, existing gas dryer, hood unit ducting, bath fan ducting.
PM20220830798
Aug 30, 2022—
PlumbingADU added in existing garage space. (1) bathroom, (2) laundry, (1) kitchen. Remove and replace existing boiler. Shower pan.
PP20220830797
Aug 30, 2022—
PlumbingWork category: 1p; install bathroom fixtures and shower trim fittings. Install kitchen sink, faucet, and dishwasher. Connect the cooktop. Connect navien tankless water heater. Put the gas piping under test.
PW20231004654
Oct 4, 2023 → Dec 18, 2023—
PlumbingAmend existing permit pw20231004654: to show rough plumbing and shower was approved under cancelled permit pp2022830797.
PP20231010445
Oct 10, 2023 → Dec 18, 2023—
Plumbing12/14/2023: we need mechanical permit for mini split. Reference pa#202212198665 and pp202109077888.
PM20231214469
Dec 14, 2023 → Dec 18, 2023—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1906, lot 017
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house