Attached · Mission
350 San Jose Ave
Completed Oct 2024+9 units on this lot · now 1317 permits
Addition of 8 units & 1 ADU to an existing 4 dwelling unit building: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to existing 2-story building; excavation of existing garage to add basement level and open space.
filed Apr 2018issued Jun 2022 · permit wait 4 years 2 monthscompleted Oct 2024 · built in 2 years 4 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$3,731,997 for 9 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
4 years 2 months
filed → issued
Build time
2 years 4 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Addition of 8 units & 1 ADU to an existing 4 dwelling unit building: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to existing 2-story building; excavation of existing garage to add basement level and open space. 201804035430 · Transatlantic Construction Company | filed Apr 2018 · issued Jun 2022 · done Oct 2024 | $3.6M | city record |
| Revision | Revision to pa# 201804035430. Backyard metal fence & guardrail structure detail. Rear patio stair & railing construction detail per arch addendum. 202309227232 · cites 201804035430 · Transatlantic Construction Company | filed Sep 2023 · issued Sep 2023 · done Oct 2024 | — | city record |
| Sprinklers | Installation of sprinkler system in the house per nfpa 13. Wet stand pipe per nfpa 14, and underground. Ref pa# 201804035430 s2. 202401194325 · cites 201804035430 · North Star Plumbing & Fire Protection INC | filed Jan 2024 · issued Mar 2024 · done Jul 2024 | $123k | city record |
| Related permit | Upgrade e) fire alarm system to comply with sffc. 202403127608 · Crime Watch Security Sys Llc | filed Mar 2024 · issued Mar 2024 · done Jul 2024 | $53k | city record |
| Electrical | Uferg. EW202308163262 | Aug 16, 2023 → Aug 18, 2023 | — | |
| Electrical | Unit# c-4 existing units a, b, c, d individual permits. E202312121150 | Dec 12, 2023 | — | |
| Electrical | Unit# d -4 existing units a, b, c, d individual permits. E202312121152 | Dec 12, 2023 | — | |
| Electrical | Unit# b -4 existing units a, b, c, d individual permits. E202312121149 | Dec 12, 2023 | — | |
| Electrical | 4 existing units need individual permits units a, b, d c. E202312121131 | Dec 12, 2023 | — | |
| Electrical | 9 new ADU(s) and permit 5000-10000 sq ft per kb; new plugs, lights, switches, subpanel. E202312121141 | Dec 12, 2023 → Aug 21, 2024 | — | |
| Electrical | 600 amp service individual permit. E202312121144 | Dec 12, 2023 → Aug 21, 2024 | — | |
| Electrical | Unit# a -4 existing units a, b, c, d individual permits. E202312121146 | Dec 12, 2023 | — | |
| Electrical | Online electrical permit: 120 of buildings of 7-12 dwelling units. Installation of a new fire alarm system with sprinkler monitoring. E202403062870 | Mar 6, 2024 → Jul 17, 2024 | — | |
| Plumbing | Work category: 8p; installation of radiant heating flooring system including 1 boiler installation. PW20231215361 | Dec 15, 2023 → Jul 25, 2024 | — | |
| Plumbing | Work category: 4pb; install fire sprinkler system for 13 units, and house to street underground piping service. PW20240223836 | Feb 23, 2024 → Jul 11, 2024 | — | |
| Plumbing | 18 shower pan water proof. PP20240423488 | Apr 23, 2024 → May 29, 2024 | — | |
| Plumbing | Work category: 1p; new permit for expired permit pw20230523211. PW20240723343 | Jul 23, 2024 → Aug 2, 2024 | — |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 6532, lot 010A
- Why we call it an ADU
- Two independent model reviewers agreed the permit creates an ADU: “"addition of 8 units & 1 adu to an (e) 4 dwelling unit bldg"; units 4 → 13”