Converted · legalization · Sunset/Parkside

3830 Judah St

Completed Jun 2024+1 unit on this lot · now 314 permits

Unit legalization per 43-14. At 1st flr, reconfigure existing bathroom, add kitchen cabinets, add bedroom closet to legalize unit. Reconfigure rear yard stairs to comply with code. Extend deck landings for bedroom egress/rescure.

filed Oct 2022issued Jul 2023 · permit wait 9 monthscompleted Jun 2024 · built in 11 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$143,492
declared across 3 permits: the ADU permit plus its sub-permits
Permit wait
9 months
filed → issued
Build time
11 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitUnit legalization per 43-14. At 1st flr, reconfigure existing bathroom, add kitchen cabinets, add bedroom closet to legalize unit. Reconfigure rear yard stairs to comply with code. Extend deck landings for bedroom egress/rescure.
202210255073 · Rua Woods Construction INC
filed Oct 2022 · issued Jul 2023 · done Jun 2024$110kcity record
SprinklersInstall a new fire sprinkler system per nfpa 13 throughout the entire first floor and interior stairwell. Including a 2 inch dedicated fire service. Total (18) heads. Ref pa# 202210255073.
202401163985 · cites 202210255073 · Best Care Fire Protection
filed Jan 2024 · issued Jan 2024 · done May 2024$21kcity record
SprinklersInstall a new spirnkler monitoring system per nfpa72-2022 section 23. 8. 5. 5. 1 with (1) fire alarm control unit (1) wireless commercial fire communicator (1) smoke dectector above the facu (1) manual pull station per sprinkler permit nfpa 13 ref pa 202401163985.
202403188056 · Poly - On Electrical
filed Mar 2024 · issued Mar 2024 · done May 2024$12kcity record
ElectricalRemodel and upgrades.
EW202401096050
Jan 9, 2024 → May 28, 2024—
ElectricalRemodel.
EW202401246327
Jan 24, 2024 → May 28, 2024—
ElectricalChange address on existing permit ew: 202401246327 change from (3832 to 3830 judah st) san francisco.
E202402222569
Feb 22, 2024—
Electrical3830-3832 judah st. Install a nwe sprinkler monitoring system to comply with sffc section 23. 8. 5. 5. Per sprinkler permit nfpa 13 # 2024-0116-3982.
E202403183149
Mar 18, 2024 → May 22, 2024—
PlumbingWork category: 2pa; basement bathroom and kitchen remodel.
PW20231215351
Dec 15, 2023 → Apr 24, 2024—
PlumbingWork category: 1p; sewer lateral replacement.
PW20231226525
Dec 26, 2023 → Jan 5, 2024—
PlumbingWork category: 1m; install mitsubishi heat pump system with qty 2 indoor fan coils. Remove qty 2 old furnaces and replace with qty 2 new furnace heating systems.
PMW20240112824
Jan 12, 2024 → Apr 26, 2024—
PlumbingWork category: 4pa; install a new fire sprinkler system per nfpa 13 throughout the entire first floor and interior stairwell. Including a 2-inch dedicated fire service. Total 18 heads. Ref#2022-1025-5073.
PW20240117944
Jan 17, 2024 → May 22, 2024—
PlumbingBathroom and kitchen remodel. Jobcard#202312293271.
PP20240119916
Jan 19, 2024 → Apr 24, 2024—
PlumbingCorrect address to 3830-3832 judah st. Amendment: update permit pw20231215351. Description to show work is to legalize plumbing. Jobcard#202210255073.
PP20240119915
Jan 19, 2024 → Apr 24, 2024—
PlumbingWork category: 1p; 2 shower pans.
PW20240221774
Feb 21, 2024 → Feb 28, 2024—
1 other permit on this lot during the project, not counted
OtherRemodel existing kitchen and bath with new fixtures and cabinets. No moving walls.
202312293271 · Rua Woods Construction INC
filed Dec 2023 · issued Dec 2023 · done Jun 2024$50kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1798, lot 060
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit"; units 2 → 3”
Claim this project or house

City record of the ADU permitProperty Information Map