Converted · garage conversion · Portola

40 Gaven St

In progress+5 units on this lot · now 1313 permits

Add unit per ordinance no. 162-16. Convert 5 covered parking space into 5 new dwelling units. For a total of 13 units. N/a for maher ordinance no. 155-13.

filed May 2017issued Jun 2022 · permit wait 5 years 1 month4 years 5 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$217,021 for 5 ADUs + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
5 years 1 month
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitAdd unit per ordinance no. 162-16. Convert 5 covered parking space into 5 new dwelling units. For a total of 13 units. N/a for maher ordinance no. 155-13.
201705055874 · Vt Construction And Remodeling
filed May 2017 · issued Jun 2022$110kcity record
SprinklersInstallation of (88) fire sprinkler system throughout ground at frist floor according to app#2021705307881 and related egress area per nfpa 13 2022 and undergrounde piping per nfpa 24 (trench, backfill, and sidwalk repair by other under separate permit).
202505297477 · Project Contractor INC
filed May 2025 · issued May 2025 · done Jun 2026$60kcity record
SprinklersUpgrade existing fire alarm system to comply with sffc section 1103. 7. 6. 1 and include sprinkler monitoring ref ADU 2017-0505-5874 & sprinkler 2025-0529-7477.
202506209126 · cites 201705055874 · Crime Watch Security Sys Llc
filed Jun 2025 · issued Jun 2025 · done Jun 2026$47kcity record
Related permitTo obtain final inspection for work approved under pa#201705055874. All work is complete.
202511199985 · cites 201705055874 · Vt Construction And Remodeling
filed Nov 2025 · issued Nov 2025—city record
ElectricalConvert (5) covered parking space into (5) new ADU including receptacles, lighting, new kitchen and bathroom smoke detectors. 100 amp new service, 4 subpanel 100 amp each. 60 lights, 30 switches, 80 recepatcles, 4 fans, 4 microwave, 4 ranges, 20 s/d.
E202403203191
Mar 20, 2024 → Jun 23, 2026—
ElectricalOnline electrical permit: 1 of buildings with more than 12 dwelling units and non-residential occupany - building up to 3 floors. Modification of an existing fire alarm system by upgrading the fire panel, update all existing devices to be compatible with new facp and pr.
E202501049108
Jan 4, 2025 → Jun 30, 2026—
ElectricalApt 9: ref e/p e202403203191 new ADU including new receptacles, lighting, new kitchen and bathroom, smoke detectors, subpanel.
E202510206488
Oct 20, 2025 → Jun 23, 2026—
ElectricalApt 10: ref e/p e202403203191 new ADU including new receptacles, lighting, new kitchen and bathroom, smoke detectors, subpanel.
E202510206489
Oct 20, 2025 → Jun 23, 2026—
ElectricalApt 11: ref e/p e202403203191 new ADU including new receptacles, lighting, new kitchen and bathroom, smoke detectors, subpanel.
E202510206491
Oct 20, 2025 → Jun 23, 2026—
ElectricalApt 12: ref e/p e202403203191 new ADU including new receptacles, lighting, new kitchen and bathroom, smoke detectors, subpanel.
E202510206492
Oct 20, 2025 → Jun 23, 2026—
PlumbingWork category: 4pb; installation of (88) fire sprinkler heads throughout ground and first floor according to fire sprinkler permit app#2025 0529 7477, also refers to building permit app#2017 0505 5874 & 2017 0530 7881 and related egress area per nfpa 13 2022 and underground piping per nfpa 24 (trench, backfill and sidewalk repair by other under separate permit).
PW20250603689
Jun 3, 2025 → Mar 3, 2026—
PlumbingTo renew permit pm20240320899 for final inspection: convert 5 parking spaces into 5 adus with kitchens and bathrooms.
PM20260610505
Jun 10, 2026—
PlumbingTo renew permit pp20240320898 for final inspections. Convert 5 parking spaces into 5 adus with new bathrooms and kitchens.
PP20260610504
Jun 10, 2026 → Jun 16, 2026—
1 other permit on this lot during the project, not counted
OtherTo comply with nov# 202298236: installation of inline booster fan for dryer duct located in garage in the rear of the building. Replace fire/smoke door at the main shared garage. Repair all damaged drywall in all garages on ground floor. Less than 50%.
202212097999
filed Dec 2022 · issued Dec 2022 · done Dec 2022$1,000city record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 5856, lot 028
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house