Converted · ground-floor conversion · Hayes Valley

419 Broderick St

Completed Mar 2026+1 unit on this lot · now 37 permits

Addition of one dwelling unit at the ground floor. The project also proposes alterations to the side stairs and structural foundation upgrades.

filed Jun 2022issued Aug 2023 · permit wait 1 year 2 monthscompleted Mar 2026 · built in 2 years 7 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$222,960
declared across 2 permits: the ADU permit plus its sub-permits
Permit wait
1 year 2 months
filed → issued
Build time
2 years 7 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitAddition of one dwelling unit at the ground floor. The project also proposes alterations to the side stairs and structural foundation upgrades.
202206287301 · Toolbox
filed Jun 2022 · issued Aug 2023 · done Mar 2026$200kcity record
SprinklersInstall new fire sprinkler system in e) building per nfpa 13 in basement only. Feef from dedicated 1'/2" fire services, scope of work incldued install underground fire service design on this system is ordinary hazard group i ref to ADU 202206287301.
202409170951 · cites 202206287301 · Aura Fire Safety
filed Sep 2024 · issued Sep 2024 · done Aug 2025$23kcity record
RevisionRevision to pa #2022-0628-7301: switch mini split heat pump to air to water hydronic system.
202603026739 · cites 202206287301 · Toolbox
filed Mar 2026 · issued Mar 2026 · done Mar 2026—city record
ElectricalInstall all new electrical wiring in the new ADU, clean & organize wires on the basement.
EW202405148665
May 14, 2024 → Aug 27, 2025—
ElectricalUpgrade the existing overhead 150 amp main electrical service with a new 400 amp overhead service. Add 1 new meter for the main ADU. 100 amp.
E20250219122
Feb 19, 2025 → Aug 27, 2025—
PlumbingWork category: 2pb; upgrade underground plumbing. Add plumbing for full bathroom, laundry and kitchen sink at additional dwelling unit on ground floor.
PW20240713146
Jul 13, 2024 → Sep 4, 2025—
PlumbingWork category: 8p; install two radiant heating systems with two ibc boilers & two storage tank to supply heating & hot water for two units. Tubing in basment level, in-slab application, tubing upstairs with heat plates under sub floors.
PW20240723348
Jul 23, 2024 → Jan 17, 2025—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1205, lot 051
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house

City record of the ADU permitProperty Information Map