Converted · ground-floor conversion · Sunset/Parkside

4350 Kirkham St

Completed Oct 2025+6 units on this lot · now 3020 permits

Add six new accessory dwelling units to the ground floor of the building under ordinance 162-16 and planning code section 207(c)(4).

filed Apr 2023issued Feb 2024 · permit wait 10 monthscompleted Oct 2025 · built in 1 year 8 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$867,543 for 6 ADUs
one permit, 6 units; not a per-unit price
Permit wait
10 months
filed → issued
Build time
1 year 8 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitAdd six new accessory dwelling units to the ground floor of the building under ordinance 162-16 and planning code section 207(c)(4).
202304276564 · Leca Construction INC
filed Apr 2023 · issued Feb 2024 · done Oct 2025$832kcity record
SprinklersDesign and install 6 new units, new nfpa 13. Fire sprinkler system in gr floor only. Building permit 202304276564.
202406285461 · cites 202304276564 · Pye-Barker Fire
filed Jun 2024 · issued Jun 2024 · done Oct 2025$26kcity record
Related permitRev 202212208741 completed 6/6/2023 with addition of 6 ADU's (under pa 2023-027-6564).
202409100407 · K K Electric & Alarm Company
filed Sep 2024 · issued Oct 2024$9,457city record
ElectricalUnit 3. New service, circuits, switches, oultets, lights, d/b, ranges microwave, fan, s/d. 1 subpanel 100 amp. 8 circuits, 10 lights, 7 switches, 10 receptacles, 1 fan, 1 d/w, 1 microwave, 1 range, 1 s/d.
E202403203218
Mar 20, 2024 → Oct 7, 2025—
ElectricalUnit 2. New service, circuits, switches, oultets, lights, d/b, ranges microwave, fan, s/d. 1 subpanel 100 amp. 8 circuits, 10 lights, 7 switches, 10 receptacles, 1 fan, 1 d/w, 1 microwave, 1 range, 1 s/d.
E202403203217
Mar 20, 2024 → Oct 7, 2025—
ElectricalUnit 1: new service, 1 sub panel 100 amp, 8 circuits, 10 lights, 7 switches, 10 receptacles, 1 fan, 1 dishwasher, 1 microwave, 1 range and 1 smioke detector.
E202403203214
Mar 20, 2024 → Oct 7, 2025—
ElectricalUnit 304 install remodel wire as needed for a new garbage disposal and dishwasher. Remove and replace existing breaker panel install at code compliant location.
EW202403207495
Mar 20, 2024 → May 21, 2024—
ElectricalInstall remodel wire as needed for a new garbage disposal and dishwasher. Remove and replace existing breaker panel install at code compliant location.
EW202403207494
Mar 20, 2024 → May 7, 2024—
ElectricalUnit 6: new service, circuits, switches, outlets, lights, d/b, ranges, microwaves, fan, receptacles, smoke detectors.
E202403213235
Mar 21, 2024 → Aug 20, 2025—
ElectricalUnit 4: new service, circuits, switches, outlets, lights, d/b, ranges, microwaves, fan, receptacles, smoke detectors.
E202403213233
Mar 21, 2024 → Oct 7, 2025—
ElectricalUnit 5: new service, circuits, switches, outlets, lights, d/b, ranges, microwaves, fan, receptacles, smoke detectors.
E202403213234
Mar 21, 2024 → Oct 7, 2025—
ElectricalInstall remodel wiring as needed for 2 new circuits ( garbage disposal, dishwasher ) install remodel wiring as needed to junction existing wiring at old panel location, extend wiring to new sub panel at code compliant location.
EW202406269560
Jun 26, 2024 → Aug 20, 2024—
ElectricalUpgrade fire alarm system to include 6 new ADU.
E202410217692
Oct 21, 2024 → Oct 1, 2025—
ElectricalInstall remodel wiring as needed for a dishwasher, garbage disposal, circuit. Relocate light fixtures as needed for new apartment layout.
EW202504015367
Apr 1, 2025 → Jun 23, 2025—
PlumbingWork category: 2pa; unit: 302&304: restub-out (remodeling) drain, vent, and cold water supply for bathroom.
PW20240319466
Mar 19, 2024 → May 17, 2024—
PlumbingUnits (1-6) new hot/ cold water, plumbing for kitchen & bath. Tub for each unit.
PP20240320922
Mar 20, 2024 → Aug 11, 2025—
PlumbingUnits (1-6) install 6 ductless split heat pump.
PM20240320925
Mar 20, 2024 → Aug 11, 2025—
PlumbingWork category: 1p; re-stub out bathroom- lav, tub/shower combo, wc lower flange. Installation dw at kitchen, existing kitchen to remain. -.
PW20240619652
Jun 19, 2024 → Aug 20, 2024—
PlumbingWork category: 4pb; design & install (6) new units - new nfpa 13 fire sprinkler system in ground floor only. Building permit: 2023-04276564.
PW20240703945
Jul 3, 2024 → Jun 27, 2025—
PlumbingWork category: 1p; unit #204. Like-for-like bathroom renovation.
PW20250404299
Apr 4, 2025 → Jun 5, 2025—
4 other permits on this lot during the project, not counted
OtherUnits# 302 and 304: like for like bathroom renovation. New circuit for garbage disposal, new electrical fixtures, flooring, paint. Same description for units. Bathroom 5' x 8'.
202402286714 · 2b Living INC
filed Feb 2024 · issued Feb 2024 · done May 2024$35kcity record
OtherUnit# 103: like for like bathroom renovation, new circuits for garbage disposal and dishwasher, r-15 insulation on exterior facing walls, paint, floor, fixtures.
202406174622 · Oakview Construction LLC
filed Jun 2024 · issued Jun 2024 · done Aug 2024$30kcity record
OtherWindow replacement(87 total) for top 3 levels of building. Cutting 4-6 inch of stucco around existing windows to repair. Replace plywood as needed for dryrot. Remove existing stucco and replace on 48th side of building. Using marvin essential brand windows like to like. Same size, locations, max u-factor0. 3.
202408279577 · Leca Construction INC
filed Aug 2024 · issued Aug 2024 · done May 2025$187kcity record
Other#204. Like for like bathroom renovation. Instulation r15, paint, flooring.
202503051599 · Oakview Construction LLC
filed Mar 2025 · issued Mar 2025 · done Jun 2025$35kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 1806, lot 045
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house

City record of the ADU permitProperty Information Map