Converted · legalization · Excelsior
547 Edinburgh St
In progress+1 unit on this lot · now 21 permit
Comply with n. O. V. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord. 43-14). Add 1-bedroom to main dwelling unit. 2/f convert existing bathroom into study room and convert existing closet into bathroom on 2nd flr. Build wetbar to dining room.
filed Oct 2025issued Sep 2026 · permit wait 11 months2 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$296,000 + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
11 months
filed → issued
Build time
in progress
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Comply with n. O. V. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord. 43-14). Add 1-bedroom to main dwelling unit. 2/f convert existing bathroom into study room and convert existing closet into bathroom on 2nd flr. Build wetbar to dining room. 202510107242 · Big 4 Construction | filed Oct 2025 · issued Sep 2026 | $296k | city record |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 6089, lot 025
- Why we call it an ADU
- Two independent model reviewers agreed the permit creates an ADU: “"legalize ground floor 2nd unit (ord.43-14)"; units 1 → 2, 1 family dwelling → 2 family dwelling”