Converted · interior conversion · Mission
61 Cypress St
In progress+1 unit on this lot · now 11 permit
Building 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2). Includes structural upgrades, framing repairs. New slab on grade & replacement of perimeter footings. Move existing floor framing down 24"± to accommodate for new ADU at level above garage. . .
filed Jan 2026issued Mar 2026 · permit wait 2 months7 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$222,120 + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
2 months
filed → issued
Build time
in progress
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Building 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2). Includes structural upgrades, framing repairs. New slab on grade & replacement of perimeter footings. Move existing floor framing down 24"± to accommodate for new ADU at level above garage. . . 202512292863 · Bradford Construction INC | filed Jan 2026 · issued Mar 2026 | $222k | city record |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 6518, lot 008
- Why we call it an ADU
- Two independent model reviewers agreed the permit creates an ADU: “"move (e) floor framing down 24"± to accommodate for new adu at level above garage"; Existing units: 0 → Proposed units: 1; use prkng garage/private → 1 family dwelling”