To add one ADU on the ground floor per government code section 65852. 2.

filed Oct 2021issued Apr 2024 · permit wait 2 years 7 months2 years 6 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$146,461 for 2 ADUs
one permit, 2 units; not a per-unit price
Permit wait
2 years 7 months
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitTo add one ADU on the ground floor per government code section 65852. 2.
202110059833 · A K A Construction Co
filed Oct 2021 · issued Apr 2024$102kcity record
SprinklersInstall a new nfpa 13, wet pipe, automatic fire sprinkler system on the ground level to convert 550 into ADU ona 4 story building. Install a new 2' dedicated underground fire service.
202510318655 · V R C Fire Protection
filed Oct 2025 · issued Nov 2025$20kcity record
SprinklersRevision to pa #2025-1031-8655. Install new nfpa 13, wet pipe automatic fire sprinkler system on the 4th floor level to a 455 sq ft in a 4 story building. Install a new a 4" dedicated underground service.
202512121651 · V R C Fire Protection
filed Dec 2025 · issued Dec 2025$19kcity record
RevisionRevision to 202110059833: modification to front facade at level 1: change window to door and window. Front facing patio with railing and small utility room to be constructed.
202607275602 · cites 202110059833 · Amherst Associates Construction Management INC
filed Jul 2026 · issued Sep 2026$5,000city record
ElectricalElectrical scope of work for the ground floor ADU includes: · wiring for 2 bathrooms, 2 bedrooms, and 1 kitchen. · installation of 1 sub-panel, 2 exhaust fans, and 1 kitchen range hood.
EW202511090722
Nov 9, 2025—
ElectricalOnline electrical permit: 120 of buildings of 7-12 dwelling units. Modification of an existing fire alarm system by upgrading the fire panel, update all existing devices to be compatible with new facp and provide low frequency sounders in all sleeping areas to meet 75db.
E202511137087
Nov 13, 2025—
Electrical4th floor udu wiring for studio with bath and kitchen.
E202606181639
Jun 18, 2026—
PlumbingWork category: 2pb; install: · (1) kitchen on the ground floor · (2) bathrooms on the ground floor, each including a shower pan · (1) kitchen on the fourth floor · (1) bathroom on the fourth floor.
PW20250930472
Sep 30, 2025—
PlumbingInstall a new nfpa 13, wet ppe automatic fire sprinkler system on the ground level to convert 550 into ADU on 4 story building.
PP20251103600
Nov 3, 2025—
PlumbingNew gas line for wall heater at 1st floor ADU.
PP20260618699
Jun 18, 2026—
PlumbingNew gas line for wall heater at 4th floor udu.
PP20260618700
Jun 18, 2026—
1 other permit on this lot during the project, not counted
OtherRevision to pa# 202001091594: update interior layout. Change bath layout. Change toilet area. No exterior change. Relocate kitchen wall.
202603258247 · Amherst Associates Construction Management INC
filed Mar 2026 · issued Mar 2026—city record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 3611, lot 034
Why we call it an ADU
SF DBI flagged the permit as an ADU.