Converted · legalization · Outer Richmond
631 43rd Ave
Completed Nov 2025+0 units on this lot · now 14 permits
To legalize existing 844 secondary unit in the first floor - behind the existing garage; to add 46 s. F. In order to enlarge the ADU's kitchen and bathroom. Per plan; to add 64 s. F. To create an independent entrance to the one bedroom, one bathroom, one complete kitchen. Living and dining room ADU.
filed Sep 2024issued Apr 2025 · permit wait 7 monthscompleted Nov 2025 · built in 7 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$215,205
declared on the ADU permit
Permit wait
7 months
filed → issued
Build time
7 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | To legalize existing 844 secondary unit in the first floor - behind the existing garage; to add 46 s. F. In order to enlarge the ADU's kitchen and bathroom. Per plan; to add 64 s. F. To create an independent entrance to the one bedroom, one bathroom, one complete kitchen. Living and dining room ADU. 202407267342 · A M S Acropolis Construction Incorporated | filed Sep 2024 · issued Apr 2025 · done Nov 2025 | $215k | city record |
| Electrical | 631-631a 43rd ave: in kind full kitchen remodel and bathroom remodel. Relocate laundry at garage area- run line for tankless water heater and mini split 2 zone heat pump. Install 30 recess lights, 3 outdoor wall mounted lights, 40 receptacles throughout the unit. Install 1 bath fan, 1 exhaust kitchen hood fan. Add new dedicated subpanel 100 amps. E202505062223 | May 6, 2025 → Oct 31, 2025 | — | |
| Plumbing | Install 2 zone mini split air conditioner with heat pump. PM20250506088 | May 6, 2025 → Oct 29, 2025 | — | |
| Plumbing | Upgrade plumbing work and underground work to legalize ADU. Upgrade main gas line to 1-1/4" pipe. PP20250701193 | Jul 1, 2025 → Oct 29, 2025 | — |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 1586, lot 003
- Why we call it an ADU
- Two independent model reviewers agreed the permit creates an ADU: “"to legalize (e) 844 secondary unit in the first floor - behind the (e) garage; ... to create an independent entrance to the one bedroom, one bathroom, one complete kitchen. living and dining room adu." Existing use: 1 family dwelling → Proposed use: 2 family dwelling”