Converted · garage conversion · Inner Richmond
667 7th Ave
Completed May 2025+1 unit on this lot · now 39 permits
Ground floor accessory dwelling unit per ordianance 162-16. Units to be located in existinggarage & storage space. Enlarge ground floor front entry door. No expansion of building envelope. Required ground floor fire sprinkler & full building fire alarm system under deferred permit.
filed Jun 2023issued Nov 2023 · permit wait 5 monthscompleted May 2025 · built in 1 year 6 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$236,854
declared on the ADU permit
Permit wait
5 months
filed → issued
Build time
1 year 6 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Ground floor accessory dwelling unit per ordianance 162-16. Units to be located in existinggarage & storage space. Enlarge ground floor front entry door. No expansion of building envelope. Required ground floor fire sprinkler & full building fire alarm system under deferred permit. 202306150219 · M N Construction INC | filed Jun 2023 · issued Nov 2023 · done May 2025 | $237k | city record |
| Sprinklers | Revsision to pa 202306150219 (669a 07th ave). Remove sprinklers and fire alarm requirement since r-3 occupancy is maintained. Remove fdc. Change rear sliding door to window. Minor wall layout of ADU. Framing/foundation revisions. 202503111967 · cites 202306150219 · M N Construction INC | filed Mar 2025 · issued Mar 2025 · done May 2025 | — | city record |
| Electrical | Remodeling living room, dining room, 2 bathrooms, 2 bedrooms, 1 sub panel & hallway. EW202311085070 | Nov 8, 2023 → Apr 9, 2024 | — | |
| Electrical | Install ufer ground. EW202402236963 | Feb 23, 2024 | — | |
| Electrical | Remodeling ADU studio; kitchen, bathroom & living area. EW202404298387 | Apr 29, 2024 → Oct 15, 2024 | — | |
| Electrical | Install 400 amp meter main service. EW202410081650 | Oct 8, 2024 → Mar 13, 2025 | — | |
| Plumbing | Sub soil; plumbing. PP20240305624 | Mar 5, 2024 → Oct 18, 2024 | — | |
| Plumbing | Work category: 2pb; bathroom kitchen and catch base. PW20240402776 | Apr 2, 2024 → Oct 18, 2024 | — | |
| Plumbing | Work category: 1m; • furnish and install one samsung hp 1. 5ton mini split system with wall mount fan coil, • furnish and install refrigeration line set and drainpipe pvc furnish and install low voltage control wiring and samsung thermostat. PMW20241001997 | Oct 1, 2024 → Oct 3, 2024 | — |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 1637, lot 013
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.