Converted · ground-floor conversion · Russian Hill

714 Bay St

In progress+2 units on this lot · now 812 permits

ADU per ordinance# 162-16 on ground floor with 1 bedroom & 1 bathroom in each unit. Add 1 powder room in staorge room. ** maher: n/a **.

filed Sep 2017issued Dec 2022 · permit wait 5 years 3 months3 years 11 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$127,377 for 2 ADUs
one permit, 2 units; not a per-unit price
Permit wait
5 years 3 months
filed → issued
Build time
in progress
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitADU per ordinance# 162-16 on ground floor with 1 bedroom & 1 bathroom in each unit. Add 1 powder room in staorge room. ** maher: n/a **.
201709117669 · Balistreri Commercial Property Development
filed Sep 2017 · issued Dec 2022$83kcity record
SprinklersRef 201709117669 units 714, 716, 718, 720- install (20) fire spirnklers at ground floor to comply with pgr nfpa 13 2022 and underground pipe pgr nfpa 24 (trench backfill and sidwalk repair with seperate permit).
202404250758 · cites 201709117669 · Project Contractor INC
filed Apr 2024 · issued Apr 2024$16kcity record
Related permitUpgrade existing fire alarm system to comply with sffc section 1103. 7. 6. 1.
202406144469 · Crime Watch Security Sys Llc
filed Jun 2024 · issued Jun 2024$29kcity record
SprinklersAs-built of pa# 202404250758, add 1 pendent sprinkler in unit b kitchen, remove 1 sprinkler at laundry room.
202410243664 · Project Contractor INC
filed Oct 2024 · issued Jan 2025—city record
RevisionRevision to pa# 201709117669: to clarify one-hour fire rating for exit passageway. (ref pa# 201709117668).
202505025720 · cites 201709117669 · Balistreri Commercial Property Development
filed May 2025 · issued May 2025—city record
ElectricalUnit #714-c: building 2 ADU on ground floor in conjunction with seismic upgrade.
E202301204660
Jan 20, 2023—
ElectricalUnit #714-b: building 2 ADU on ground floor in conjunction with seismic upgrade.
E202301204659
Jan 20, 2023—
ElectricalModification of an existing fire alarm system by upgrading the fire panel, update all existing devices to be compatible with new facp and provide low frequency sounders in all sleeping areas to meet 75db at pillow to comply with sffd bulletin 1103. 7. 6. 1.
EW202311044973
Nov 4, 2023—
PlumbingWork category: 2pb; replace existing under ground sewage pipe.
PW20230405004
Apr 5, 2023 → Apr 17, 2023—
PlumbingWork category: 4pa; installation of (20) fire sprinkler heads at ground floor for ADU units. According to fire sprinkler permit app# 2024 0425 0758 also referred to building permit app#2017 0911 7669 per nfpa 13 2022 and underground pipe per nfpa 24 (trench, backfill and sidewalk repair by other under separate permit).
PW20240523012
May 23, 2024 → Sep 24, 2024—
PlumbingTo renew expred permit pp20240117875.
PP20260324138
Mar 24, 2026 → Apr 1, 2026—
PlumbingTo renew expired permit pp20230120143 for final inspection.
PP20260324140
Mar 24, 2026—

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 0027, lot 004
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house

City record of the ADU permitProperty Information Map