Converted · ground-floor conversion · Nob Hill
737 Pine St
Completed Nov 2024+6 units on this lot · now 4624 permits
Addition of six (6) accessory dwelling units (ADU), to an existing forty (40) unit building for a total of 46 units per ordinance 162-16. The proposed adus are located within the existing building envelope at the 1st floor.
filed Dec 2020issued Jun 2022 · permit wait 1 year 6 monthscompleted Nov 2024 · built in 2 years 6 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$902,732 for 6 ADUs
one permit, 6 units; not a per-unit price
Permit wait
1 year 6 months
filed → issued
Build time
2 years 6 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Addition of six (6) accessory dwelling units (ADU), to an existing forty (40) unit building for a total of 46 units per ordinance 162-16. The proposed adus are located within the existing building envelope at the 1st floor. 202012100754 · Wickman Development And Construction | filed Dec 2020 · issued Jun 2022 · done Nov 2024 | $701k | city record |
| Sprinklers | Installation of fire sprinkler system per nfpa 13. Providing coverage to new 6 ADU's, added to level 1 of existing building 202012100754. Scope of work includes fire only service, backflow, and underground piping. 202304115467 · cites 202012100754 · Control Fire INC | filed Apr 2023 · issued May 2023 · done Nov 2024 | $63k | city record |
| Related permit | Fire only - evacation maps(15) on floors 1-6. All signs are non-electrical. 202403208224 · Speargrass Environmental Graphics Sign | filed Mar 2024 · issued Jul 2024 · done Dec 2024 | $7,197 | city record |
| Revision | Revision to permit 202012100754. Remove from scope: the proposed partition walls, slab and steps within storage rooms. 202404039262 · cites 202012100754 · Wickman Development And Construction | filed Apr 2024 · issued Apr 2024 · done Nov 2024 | — | city record |
| Sprinklers | Fire only service, backflow underground piping to protect with approved backflow device per nfpa 13. Control fire starts at curb and includes undergound. Will tie into existing main and install service inside curb. Ref 202404039262. Hatched area not part of the scope of work - existing coverage to r. 202409120622 · Control Fire INC | filed Sep 2024 · issued Sep 2024 · done Nov 2024 | $9,992 | city record |
| Related permit | Fire alarm in 6 new adus ground floor ref 202012100754. Install additional low freq sounders in new adus sleeping areas to comply with sffc 1103. 7. 6. 1. Replace 4 obsolete cwsi system with new notifier on a like for like basis. 202410042306 · cites 202012100754 · Aec Alarms | filed Oct 2024 · issued Oct 2024 · done Oct 2024 | $122k | city record |
| Related permit | Rev 202403208224- (10) evacuation maps as builts fire only permit. All signs are non electrical. 202411215445 · Speargrass Environmental Graphics Sign | filed Nov 2024 · issued Nov 2024 · done Dec 2024 | — | city record |
| Electrical | Unit 51 - convert existing kitchen to study relocate kitchen; rehab existing bathroom and install washer/dryer. Ref to building pa #202206156406. E202209262598 | Sep 26, 2022 → Feb 16, 2023 | — | |
| Electrical | Rewire of laundry room. EW202209296318 | Sep 29, 2022 | — | |
| Electrical | #6: rehab existing kitchen and bathroom. Install clothes washer and dryer. Rewire lights, switches and receptacles. 9 lights, 10 switches, 28 receptacles. E202308228883 | Aug 22, 2023 → Dec 5, 2023 | — | |
| Electrical | New wiring for 6 ADU units at ground floor. EW202310174509 | Oct 17, 2023 → Oct 31, 2024 | — | |
| Electrical | Refer to permit ew202310174509. Add permit for d. EW202310204637 | Oct 20, 2023 → Aug 21, 2024 | — | |
| Electrical | Refer to permit ew202310174509 add permit for e. EW202310204639 | Oct 20, 2023 → Aug 21, 2024 | — | |
| Electrical | Refer to permit ew202310174509 add permit for f. EW202310204640 | Oct 20, 2023 → Aug 21, 2024 | — | |
| Electrical | Refer to permit ew202310174509 add permit for g. EW202310204641 | Oct 20, 2023 → Aug 22, 2024 | — | |
| Electrical | Refer to permit ew202310174509 add permit for c. EW202310204636 | Oct 20, 2023 → Aug 21, 2024 | — | |
| Electrical | Online electrical permit: 4 of 4 - 9 floors. Building has 6 new ADU's on ground floor (refer to 2020-1210-0754). Install additional lfs in new ADU sleeping areas to comply with sffc 1103. 7. 6. 1 replace existing obsolete cwsi system with new notifier on a like for like ba. E202410097364 | Oct 9, 2024 → Oct 23, 2024 | — | |
| Electrical | Online electrical permit: 120 of buildings of 7-12 dwelling units. Addition of 5 low frequency sounders and relocation of 10 wireless low frequency sounders due to remodels in unit 23, 25, 27, 41, 46, 61, 65. . E202410167589 | Oct 16, 2024 | — | |
| Plumbing | Unit 51 - convert existing kitchen to study relocate kitchen; rehab existing bathroom and install washer/dryer. PP20220926247 | Sep 26, 2022 → Feb 16, 2023 | — | |
| Plumbing | Work category: 2pa; relocating dwv, gas and water lines to serve three washer/dryer. One new floor drain with trap primer. PW20221011634 | Oct 11, 2022 → Nov 2, 2022 | — | |
| Plumbing | #6: rehab existing kitchen and bathroom. Install clothes washer. Install dishwasher, replace kitchen sink, bathroom lavatory sink, toilet and bath tub. PP20230822590 | Aug 22, 2023 → Dec 5, 2023 | — | |
| Plumbing | Work category: 2pa; rough in and trim out: 6 units ( bathroom, kitchen and laundry each unit) waste, vent, hot and cold water supply pipes. 6 shower pans. PW20231018942 | Oct 18, 2023 → Sep 27, 2024 | — | |
| Plumbing | Work category: 2pa; install one boiler & hot water tank, to supply hot water & heating for six new unit on street level apartments install twin flow wall heaters. PW20231020007 | Oct 20, 2023 → Oct 3, 2024 | — | |
| Plumbing | Work category: 4pa; installing a new fire sprinkler system. PW20241106946 | Nov 6, 2024 → Nov 8, 2024 | — |
4 other permits on this lot during the project, not counted
| Other | Unit 51 - convert existing kitchen to study. Relocate kitchen; rehab existing bathroom and install washer/dryer. 202206156406 · Axel8 Construction LLC | filed Jun 2022 · issued Sep 2022 · done Mar 2023 | $44k | city record |
| Other | Re-roofing. 202307071667 · Rain Defense | filed Jul 2023 · issued Jul 2023 · done Sep 2023 | $19k | city record |
| Other | Unit 6 - rehabilitate existing kitchen and bathroom; install washer/dryer. 202308144390 · Axel8 Construction LLC | filed Aug 2023 · issued Aug 2023 · done Dec 2023 | $55k | city record |
| Other | Concrete repair of slab & beams @ lower garage ceiling, form 8 to form 3 conversion, p. Chan reviewed/commented at counter, dmj 10/13/2023;. 202309196934 · U S Prime Contractor INC | filed Sep 2023 · issued Dec 2023 · done Apr 2024 | $50k | city record |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 0272, lot 001B
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.