Converted · legalization · Noe Valley

79 28th St

In progress+1 unit on this lot · now 26 permits

The proposed project includes a full interior & rear and front horizontal addition. Legalized a full separate unit(1495 s. F. ) @ 1st flr. Main unit(3368 s. F. ) with 3 bedrms. Smaller unit with 1 bedrm. Two-car garage shared by 2 units. Roof change from ridged to flat roof.

filed Sep 2023issued Apr 2024 · permit wait 7 months2 years 6 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$800,000 + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
7 months
filed → issued
Build time
in progress
issued → completed
Builder
No contractor listed

Permits in this project

PermitWhatWhenDeclared
ADU permitThe proposed project includes a full interior & rear and front horizontal addition. Legalized a full separate unit(1495 s. F. ) @ 1st flr. Main unit(3368 s. F. ) with 3 bedrms. Smaller unit with 1 bedrm. Two-car garage shared by 2 units. Roof change from ridged to flat roof.
202309277523
filed Sep 2023 · issued Apr 2024$800kcity record
ElectricalRewire, new construction.
EW202407109815
Jul 10, 2024—
Electrical(1) 100a with 10 circuits temp power pole.
EW202407179932
Jul 17, 2024—
ElectricalRewire entire house to include new switches, receptacles, lights, and upgrade for main panel to 200amps.
E202501089226
Jan 8, 2025—
PlumbingWork category: 1p; sewer lateral replacement.
PW20240927918
Sep 27, 2024 → Oct 3, 2024—
PlumbingShower pan installation in residential bathroom under owner builder permit.
PP20250725708
Jul 25, 2025 → Aug 15, 2025—
2 other permits on this lot during the project, not counted
OtherRe-roofing: remove and replace roofing material / existing roofing material (in-kind).
202409201310 · Apollo Roofing Company
filed Sep 2024 · issued Sep 2024$12kcity record
OtherRe-roofing: remove and replace roofing material / existing roofing material (in-kind).
202411084706 · Dura - Foam INC
filed Nov 2024 · issued Nov 2024 · done Jun 2025$9,600city record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 6616, lot 034
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"legalized a full separate unit(1495 s.f.) @ 1st flr. main unit(3368 s.f.) w/ 3 bedrms. smaller unit w/ 1 bedrm"; units 1 \u2192 2, use 1 family dwelling \u2192 2 family dwelling”
Claim this project or house

City record of the ADU permitProperty Information Map