Converted · ground-floor conversion · West of Twin Peaks
815A Miramar Ave
Completed Mar 2024+1 unit on this lot · now 25 permits
Proposed 1215 sq ft ADU in lower level of house. ADU to include new bedroom, new bathroom, new kitchen, new dining room and new craft room.
filed Sep 2021issued May 2022 · permit wait 8 monthscompleted Mar 2024 · built in 1 year 10 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$200,000
declared on the ADU permit
Permit wait
8 months
filed → issued
Build time
1 year 10 months
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Proposed 1215 sq ft ADU in lower level of house. ADU to include new bedroom, new bathroom, new kitchen, new dining room and new craft room. 202109178692 · Proyecto | filed Sep 2021 · issued May 2022 · done Mar 2024 | $200k | city record |
| Electrical | Electircal for new 125 sq ft ADU in existing unconditioned storage; that includes lighting, kitchen, dining, laundry, bathroom, sauna room and bedroom. Upgrade existing 100a electrical oh services to 2-meter 200a service. One serving main home and one for new ADU. Install 2 subpanels in garage to serve existing and new dwelling unit. Install (1) new level 2 ev charging station. E202301094412 | Jan 9, 2023 → Jan 9, 2024 | — | |
| Electrical | Remove existing 100a meter, 120/240v, 1 phase, 3-wire, electrical oh service. Furnish and install new new 2-position meter, 200a, 1-phase, 3-wire electrical oh service. Meters to serve 815 miramar and 815a miramar. EW202306222013 | Jun 22, 2023 | — | |
| Plumbing | Install new dww and water supply for new ADU at ground level. New kitchen, 1 new bathroom and custom shower pan, new laundry hook-ups and water heater upgrade. PP20230109911 | Jan 9, 2023 → Feb 2, 2024 | — | |
| Plumbing | Work category: 1m; installation of (2) multizone heat pump systems. PMW20230417291 | Apr 17, 2023 → Feb 2, 2024 | — |
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 3107, lot 004
- Why we call it an ADU
- SF DBI flagged the permit as an ADU.