Converted · ground-floor conversion · Nob Hill

969 Bush St

Completed Jan 2025+4 units on this lot · now 3323 permits

Convert existing storage & utility rooms on ground floor into (4) new dwelling units for a building total of (33) units.

filed Sep 2020issued Apr 2022 · permit wait 1 year 7 monthscompleted Jan 2025 · built in 2 years 9 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$432,214 for 4 ADUs
one permit, 4 units; not a per-unit price
Permit wait
1 year 7 months
filed → issued
Build time
2 years 9 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitConvert existing storage & utility rooms on ground floor into (4) new dwelling units for a building total of (33) units.
202009013129 · S L M Development INC
filed Sep 2020 · issued Apr 2022 · done Jan 2025$371kcity record
SprinklersFull fire sprinkler system for new ADU. Install new water serivce line for new ADU. Ref permit 202009013129.
202207148451 · cites 202009013129 · A M West Mechanical INC
filed Jul 2022 · issued Nov 2022 · done Jun 2024$50kcity record
RevisionRevision to pa#202009013129. Relocate proposed concrete sheer walls. Reconfigure proposed decks, stairs, and private patio at rear yard.
202211237127 · cites 202009013129 · S L M Development INC
filed Nov 2022 · issued Jul 2023 · done Jan 2025—city record
Related permitRef 202009013129 install low frequency sounders in ADU sleeping area to meet with sffc 1103. 7. 6. 1.
202404049305 · cites 202009013129 · Aec Alarms
filed Apr 2024 · issued Apr 2024 · done May 2024$11kcity record
Related permitAs builts - ref pa# 202207148451.
202405303267 · A M West Mechanical INC
filed May 2024 · issued May 2024 · done Jun 2024—city record
ElectricalConvert garage to 4 ADU; unit #3 (1bed + 1 bath); electrical work for entire unit.
E202204079466
Apr 7, 2022 → Jun 25, 2024—
ElectricalConvert garage to 4 ADU; unit #4 (1bed + 1 bath); electrical work for entire unit.
E202204079467
Apr 7, 2022 → Jun 25, 2024—
ElectricalConvert garage to 4 ADU; unit #1 (1 bed + 1 bath); elecrical work for entire unit.
E202204079463
Apr 7, 2022 → Jun 25, 2024—
ElectricalConvert garage to 4 ADU; unit #2 (1 bed + 1 bath); electrical work for entire unit.
E202204079464
Apr 7, 2022 → Jun 25, 2024—
ElectricalUnit 9: install washer/dryer, 1 light, 3 switches, 1 fan.
E202204149632
Apr 14, 2022 → Jul 18, 2022—
ElectricalConvert existing storage and utility room to 4 ADU(s) unit#1, 1 bed and 1 bath.
E202208051753
Aug 5, 2022—
ElectricalConvert existing storage and utility room to 4 ADU(s) unit#2, 1 bed and 1 bath.
E202208051754
Aug 5, 2022—
ElectricalConvert existing storage and utility room to 4 ADU(s) unit#3, 1 bed and 1 bath.
E202208051755
Aug 5, 2022—
ElectricalConvert existing storage and utility room to 4 ADU(s) unit#4, 1 bed and 1 bath.
E202208051756
Aug 5, 2022—
ElectricalUnit 106 install 1 new clothes wsher and dryer. No structural wall demo. Ref 2022 0817 0738.
E202209232566
Sep 23, 2022 → Dec 8, 2022—
ElectricalOnline electrical permit: 60 of buildings of 6 dwelling units or less. ADU install low frequency soudner to comply with 1103. 7. 6. 1.
E202404083609
Apr 8, 2024 → May 8, 2024—
PlumbingConvert existing storage and utility room on ground floor into 4 adus; (1bed + 1 bath for each unit).
PP20220407170
Apr 7, 2022 → Sep 30, 2024—
PlumbingUnit 202: install (1) new washer/dryer.
PP20220414324
Apr 14, 2022 → Jul 18, 2022—
PlumbingInstall clothes washer/ dryer.
PP20220923217
Sep 23, 2022 → Dec 2, 2022—
PlumbingWork category: 8p; furnish and install one 100mbh condensing boiler with expansion tank and new pvc vent piping to connect with existing piping. Furnish and install two four-zone radiant heat manifolds with eight wall fan convector radiators. Furnish and install copper supply and return lines from manifold to boiler room.
PW20231025140
Oct 25, 2023 → Jul 16, 2024—
PlumbingWork category: 8p; replacement of tankless dhw boiler on the right-hand side.
PW20240229967
Feb 29, 2024 → Mar 14, 2024—
PlumbingWork category: 4pa; install fire sprinkler system in new ADU's.
PW20240327627
Mar 27, 2024 → Apr 1, 2024—
PlumbingWork category: 8p; replacement of left-hand side dhw boiler.
PW20240812810
Aug 12, 2024 → Sep 5, 2024—
2 other permits on this lot during the project, not counted
OtherUnit 106 install 1 new clothes wsher and dryer. No structural wall demo.
202208170738 · Ps2
filed Aug 2022 · issued Sep 2022 · done Dec 2022$4,500city record
OtherMake repairs per facade inspection report per SF facade maintenance program (sffmp) remove, prep and recoat loose and falling coating throughout exterior facade. Repair instances of spalling concrete, seal open penetrations. Secure unsecured pipes and wiring. Replace cracked brick and in units. . .
202410183250 · Dabl- Rr Builders INC
filed Oct 2024 · issued Jan 2025 · done Dec 2025$90kcity record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 0282, lot 013
Why we call it an ADU
SF DBI flagged the permit as an ADU.
Claim this project or house

City record of the ADU permitProperty Information Map