Converted · legalization · Castro/Upper Market

281A Castro St

Completed May 2026+1 unit on this lot · now 34 permits

Legalization of existing studio unit to comply with nov 202182222: interior remodel to create ADU at 1/f level of existing 3-story, 2-unit.

filed Oct 2025issued Jan 2026 · permit wait 3 monthscompleted May 2026 · built in 4 months
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$128,175
declared on the ADU permit
Permit wait
3 months
filed → issued
Build time
4 months
issued → completed

Permits in this project

PermitWhatWhenDeclared
ADU permitLegalization of existing studio unit to comply with nov 202182222: interior remodel to create ADU at 1/f level of existing 3-story, 2-unit.
202510076859 · J & J Dynamic Construction INC
filed Oct 2025 · issued Jan 2026 · done May 2026$128kcity record
ElectricalUnit #a basement level: bathroom renovation, kitchen renovation, and installation of a new subpanel. (2) lights (3) switches, (8) receptaclees, (1) garbage disposal, (1) range, (2) smoke detectors.
E202602028633
Feb 2, 2026 → Apr 24, 2026—
PlumbingUnit #a basement level: bathroom renovation, kitchen renovation. (1) shower pan.
PP20260202139
Feb 2, 2026 → Apr 28, 2026—
PlumbingInstallation of gas wall heater.
PM20260227665
Feb 27, 2026 → Mar 20, 2026—
1 other permit on this lot during the project, not counted
OtherAddressing permit only. Add 283 castro st for the first-floor rear unit within a two-unit residential building. Link to parcel 3561-033.
202603318641
filed Mar 2026 · issued Apr 2026 · done Jul 2026—city record

Trade permits show what work was done and when; the city does not record who pulled them.

Lot
block 3561, lot 033
Why we call it an ADU
Two independent model reviewers agreed the permit creates an ADU: “"legalization of (e) studio unit to comply with nov 202182222: interior remodel to create adu at 1/f level of (e) 3-story, 2-unit." Units: 2 \u2192 3”
Claim this project or house

City record of the ADU permitProperty Information Map

Converted · legalization ADU at 281A Castro St · MiCasa