Converted · legalization · Bayview Hunters Point
4736A 3rd St
In progress+1 unit on this lot · now 19 permits
Alter site pa# 2017-0425-4772 and comply with nov 20218935. Building c(rear building) 1st floor legalization per ord# 43-14. Demolish 2nd floor illegal unit at rear lot. Demolish commercial existing storage at 1st floor rear lot and conver to residential. Total 950 SF new habitable area.
filed Jan 2023issued Aug 2024 · permit wait 1 year 7 months2 years 3 months since issue
waiting for permitconstructionrelated building permitelectrical permitplumbing permit
Declared value
$146,420 + other work
the permit also covers work unrelated to the ADU, so this is not an ADU price
Permit wait
1 year 7 months
filed → issued
Build time
in progress
issued → completed
Permits in this project
| Permit | What | When | Declared | |
|---|---|---|---|---|
| ADU permit | Alter site pa# 2017-0425-4772 and comply with nov 20218935. Building c(rear building) 1st floor legalization per ord# 43-14. Demolish 2nd floor illegal unit at rear lot. Demolish commercial existing storage at 1st floor rear lot and conver to residential. Total 950 SF new habitable area. 202301301003 · Rivera Rivas Ivan Alberto | filed Jan 2023 · issued Aug 2024 | $131k | city record |
| Sprinklers | Install fire sprinkler system per nfpa-13 in new ADU. Ref permits 201704254772-s1 and 202301301003-s1. 202512111480 · cites 202301301003 · Fire Guard Protection INC | filed Dec 2025 · issued Dec 2025 | $15k | city record |
| Electrical | Upgrade 150 amp main to 200 amp main. Install one additional meter and load center at unit 4734a. E202412319064 | Dec 31, 2024 | — | |
| Electrical | Amend e202412319064, update description: upgrade 150 amp main to 200 amp main. Install one additional meter and load center at unit 4736a. E202502049777 | Feb 4, 2025 | — | |
| Electrical | Install (1) 70amp meter and main. E202508255027 | Aug 25, 2025 → Sep 4, 2025 | — | |
| Electrical | Electrical for new building. 40 lights, switches, plugs, fans, 1 dw, 1 gd, 1 mw, 1 range, 3 smoke det. E202510076214 | Oct 7, 2025 | — | |
| Plumbing | Plumbing for new building with underground. PP20251007117 | Oct 7, 2025 | — | |
| Plumbing | Work category: 4pa; install fire sprinkler system per nfpa13 in new ADU unit, 2" fire service and backflow from meter to riser location no underground work. PW20260410023 | Apr 10, 2026 | — | |
| Plumbing | Work category: 1m; installation of 80% efficient furnace. PMW20260420279 | Apr 20, 2026 | — |
1 other permit on this lot during the project, not counted
| Other | Paint new sign over existing sign "pumpkins". 202505297543 | filed May 2025 · issued May 2025 | $10k | city record |
These permits also cite 201704254772, which the city filed before our records begin.
Trade permits show what work was done and when; the city does not record who pulled them.
- Lot
- block 5311, lot 033
- Why we call it an ADU
- Two independent model reviewers agreed the permit creates an ADU: “"bldg c(rear bldg) 1st floor legalization per ord# 43-14... demolish commercial (e) storage at 1st floor rear lot and conver to residential. total 950 sf new habitable area"; units 0 → 1, retail sales → 1 family dwelling”